Drawing for TRONIC

USPTO serial 79381750

TRONIC

Reviewed by CopyMark Law Group

Reg. 7592579Status 700Registered
Filing date
Status date
Registration date
Dec 10, 2024
Examiner
BLAZICH, JOAN MICHELE
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with TRONIC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Scott Greenberg

Scott Greenberg Culhane PLLC13101 Preston Road, Ste. 110-1520Dallas, TX 75240United States

Goods and services

ClassDescriptionStatusFirst use
006Building and construction materials and elements of metal, namely, metal cladding, wall framing made primarily of metal, metal fascia and metal soffits, metal ladders and scaffolding, metal fences, and metal doors, gates, windows and window coverings in the nature of metal indoor window blinds; pillars of metal for building; non-mechanical cable drums of metal; metal boxes for general use storage purposesACTIVE—
009Battery chargers, chargers, namely, wireless chargers, portable power chargers and mobile phone chargers; battery charging adapters for electric vehicles; battery charging adapters for recharging electric vehicles; charging stations for electric vehicles; electricity storage apparatus, namely, electric accumulators; car battery charger; mains chargers being USB charging ports; chargers for electric batteries; locks, electric; equipment and fittings for charging electric vehicles, namely, charging stations, electric charging cables, electric plugs, electrical connectors and test equipment in the nature of voltage testers and battery testers for charging electric cars; electric vehicle charging systems consisting primarily of battery chargers; electrical apparatus, namely, charging stations and other devices in the nature of batteries for charging and controlling electric vehicles; battery chargers and charging cables for electric vehicles; batteries for vehicles; batteries, electric batteries and structural parts therefor; electric batteries for powering electric vehicles; electric accumulators and structural parts therefor; fuel cells and structural parts thereof; rechargeable electric batteries; batteries, electric, for vehicles; batteries and battery chargers for electric vehicles; electric power connectors to charge electric vehicles; electric accumulators, aerials, electric batteries and mounts; mounts for battery chargers; downloadable and recorded software for automating electrical power generating and charging systems; downloadable mobile apps for automating electrical power generating and charging systems; downloadable and recorded computer software for the operation of charging stations for charging electric vehicles and other electrical loads and associated electricity generation systems; downloadable and recorded software and hardware for wireless power transfer for use in charging motor vehicles; downloadable and recorded computer software applications for locating charging stations; all the aforesaid software products not for use in the field of insurance underwriting; domestic power stations, namely, photovoltaic installations comprised of solar modules for production of electricity, solar thermal and electric receivers, tracking mechanisms and concentrating optics, and control algorithms with inverters and electricity trading; solar batteries; solar battery chargers; photovoltaic apparatus and installations for generating solar electricity, namely, solar modules for production of electricity, solar thermal and electric receivers, tracking mechanisms and concentrating optics, and control algorithms; automotive measuring instruments, namely, electric meters and voltage testers; magnetic identifying strip cards, integrated circuit cards being smart cards, bags specially adapted for storing charging cables, charging systems comprised of battery chargers and adapter plugs; holders adapted for mobile phones; holders adapted for mobile phones with suction pads; hands-free holders for cell phones; hands-free tablet computer and cell phone holders for mounting in cars; holders adapted for mobile phones for mounting in cars or on motorcyclesACTIVE—
019Building and construction materials and elements, not of metal, namely, fiberglass panels, floor boards, fascia, non-metal doors with integrated insect protection, bitumen tape, interior window coverings in the nature of vertical and horizontal louvre grids not of metal, non-metal scaffolding, boards of wood, hardwood, particle board, wall board, non-metal window casements, sashes, frames and shutters, and rigid pipes, not of metal, for building; non-metallic pillars for buildingACTIVE—
020Non-mechanical cable drums of non-metallic materials; non-metallic containers for commercial use, and structural closures and holders therefor; storage chests made of plastic; plastic boxes for general use storage purposes; storage chests made of wood; storage baskets being furniture; storage drawers being furnitureACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 31, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 14, 2025FICSFINAL DISPOSITION NOTICE SENT TO IB—
May 14, 2025FIMPFINAL DISPOSITION PROCESSED—
Apr 12, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 25, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 25, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 10, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 10, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Dec 10, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 10, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 10, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 21, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 6, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 1, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Aug 1, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 1, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 1, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 23, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 23, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 23, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 19, 2024RFNTREFUSAL PROCESSED BY IB—
Feb 26, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 26, 2024RFRRREFUSAL PROCESSED BY MPU—
Feb 21, 2024LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Feb 2, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 1, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 29, 2024DOCKASSIGNED TO EXAMINER—
Dec 25, 2023LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Oct 31, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 27, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 26, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance