USPTO serial 79381871
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Debra S. Serota
Debra S. Serota Fish & Richardson P.C.P.O. Box 1022Mies-van-der-Rohe-Str. 8Minneapolis, MN 55440-1022| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal pipes, bends being metal pipe elbows and branches being metal branching pipes, all for water drainage; accessories for pipes, namely, drain traps and fastening anchors, all made of metal; metal roof drains; metal pipes, bends being metal pipe elbows, and branches being metal branching pipes, all for drainage, wastewater and sewage installations; all the aforementioned goods only for use in the area of drains, drainage channels and sewage pipes as well as connecting parts for these being metal pipe connectors; common metals and their alloys; metal materials for building and construction, namely, metal pipes and drains; metal pipes and fittings therefor; accessories for pipes made of metal, namely, bends being metal pipe elbows, branches being metal branching pipes, couplings, sockets, clamps, increasers, reducers, stops, pipe hangers, adaptors, flanges, plugs; drain pipes of metal; trench drains of metal; metal drainage pipes accessories made of metal, namely, covers, filters, grates, traps, plugs, inserts, and baskets, adapted for metal drainage pipes; metal gutters accessories made of metal, namely, leaf guards adapted for metal gutters; marine metal drainage pipes and parts and fittings therefor; metal roof gutters; leaf guards of metal for gutters; fire-proof drain traps of metal; metal drainage pipes for showers; metal gutter drains, pipes and traps | ACTIVE | — |
| 009 | Electronic apparatus, comprised of gateway routers, monitors, controllers, and alarms, sold together as a unit and used for detecting and monitoring roof drainage for water levels, blockage, and temperature | ACTIVE | — |
| 011 | Plumbing supplies, namely, pipes and fittings, in the nature of pipes and drains being parts of sanitary installations; accessories for pipes, namely, sockets, and couplings being parts of sanitary installations; floor drains being parts of sanitary installations; trench drains being parts of sanitary installations; drain gutters and parts thereof, namely, grates, traps, outlets, sediment containers, gutter angle pieces, filter baskets, and structural and replacement parts thereof, all being parts of sanitary installations; sanitary installations being drainage, wastewater and sewage disposal and treatment plants composed of metal pipes, bends, and branches all being parts of sanitary installations; all the aforementioned goods for use in the area of drains, drainage channels and sewage pipes as well as connecting parts being pipe and drain fittings; floor drain accessories, namely, covers, filters, grates, traps, plugs, inserts, and baskets, adapted for and being parts of sanitary installations in the nature of floor drains; marine drains being floor drains and structural and replacement parts and fittings therefor | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 24, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Oct 2, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Oct 2, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jun 25, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 12, 2025 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Mar 26, 2025 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 26, 2025 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Mar 25, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Mar 25, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 4, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 4, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 29, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 14, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 14, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 14, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 14, 2025 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Nov 10, 2024 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Nov 10, 2024 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 10, 2024 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 14, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 14, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 14, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 8, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 15, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 15, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 27, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 26, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 19, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 11, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 7, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 26, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |