Drawing for E SLIDE

USPTO serial 79382272

E SLIDE

Reviewed by CopyMark Law Group

Reg. 7464746Status 700Registered
Filing date
Status date
Registration date
Aug 6, 2024
Examiner
ABID, NABEELA
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with E SLIDE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Daniel J. Hudak, Jr.

Daniel J. Hudak, Jr. HUDAK, SHUNK & FARINE CO. LPA30B NORTHWEST AVE., SUITE 210Tallmadge, OH 44278United States

Goods and services

ClassDescriptionStatusFirst use
017Electrochromic films as sun screens for solar modules of solar heating systems and solar water heaters that are electrically switchable between a transparent state and an opaque state, namely, semi-finished plastic films to be used in solar modules; electrochromic films as sun screens for solar thermal collectors for heating, solar collectors for heating, and evacuated heat pipe solar collectors being heat exchangers, namely, semi-finished plastic films to be used in solar modules; electrochromic films as devices for varying the incidence of sunlight onto solar modules of solar heating systems and solar water heaters, namely, semi-finished plastic films to be used in solar modules; electrochromic films as devices for varying the incidence of sunlight onto solar thermal collectors for heating, solar collectors for heating, and evacuated heat pipe solar collectors being heat exchangers, namely, semi-finished plastic films to be used in solar modulesACTIVE—
037Installation, maintenance and repair of sun screens with a solar transmittance that can be varied exclusively by switching on, varying and switching off an electric field applied to an electrochromic solar protection film fixed to the sun screen for the protection of solar collectors of solar heating systems and solar collectors of solar water heaters, namely, installation, maintenance and repair of solar installations for generating power, solar collectors being heat exchangers and photovoltaic modules; installation, maintenance and repair of sun screens with a solar transmittance that can be varied exclusively by switching on, varying and switching off an electric field applied to an electrochromic solar protection film fixed to the sun screen for the protection of solar thermal collectors for heating, solar collectors for heating, and evacuated heat pipe solar collectors being heat exchangers, namely, installation, maintenance and repair of solar installations for generating power, solar collectors being heat exchangers and photovoltaic modules; installation, maintenance and repair of devices for varying the incidence of sunlight on solar collectors of solar heating systems and solar collectors of solar water heaters exclusively by switching on, varying and switching off an electric field applied to an electrochromic solar protection film fixed to the device, namely, installation, maintenance and repair of solar installations for generating power, solar collectors being heat exchangers and photovoltaic modules; installation, maintenance and repair of devices for varying the incidence of sunlight on solar thermal collectors for heating, solar collectors for heating, and evacuated heat pipe solar collectors being heat exchangers exclusively by switching on, varying and switching off an electric field applied to an electrochromic solar protection film fixed to the device, namely, installation, maintenance and repair of solar installations for generating power, solar collectors being heat exchangers and photovoltaic modules; installation, maintenance and repair of solar thermal installations, namely, installation, maintenance and repair of solar installations for generating power, solar collectors being heat exchangers and photovoltaic modules; installation, maintenance and repair of electrochromic films as sun screens for solar modules of solar heating systems and solar water heaters, namely, installation, maintenance and repair of solar installations for generating power, solar collectors being heat exchangers and photovoltaic modules; installation, maintenance and repair of electrochromic films as sun screens for solar thermal collectors for heating, solar collectors for heating, and evacuated heat pipe solar collectors being heat exchangers, namely, installation, maintenance and repair of solar installations for generating power, solar collectors being heat exchangers and photovoltaic modules; installation, maintenance and repair of electrochromic films as devices for varying the incidence of sunlight onto solar modules of solar heating systems and solar water heaters, namely, installation, maintenance and repair of solar installations for generating power, solar collectors being heat exchangers and photovoltaic modules; installation, maintenance and repair of electrochromic films as devices for varying the incidence of sunlight onto solar thermal collectors for heating, solar collectors for heating, and evacuated heat pipe solar collectors being heat exchangers, namely, installation, maintenance and repair of solar installations for generating power, solar collectors being heat exchangers and photovoltaic modulesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 19, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 31, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 31, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Feb 22, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jan 31, 2025FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 31, 2025FIMPFINAL DISPOSITION PROCESSED—
Nov 7, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 6, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 6, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 21, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 21, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 1, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 16, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 16, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Apr 16, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 16, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 16, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 10, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 10, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 10, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 27, 2024RFNTREFUSAL PROCESSED BY IB—
Mar 4, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 4, 2024RFRRREFUSAL PROCESSED BY MPU—
Feb 10, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 9, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 9, 2024DOCKASSIGNED TO EXAMINER—
Nov 7, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 3, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 2, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance