USPTO serial 79382368
BLADT INDUSTRIES
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- —
- Examiner
- JANSON, ANDREW KYLE
- Law office
- TMEG LAW OFFICE 105
What this means
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
Need help with BLADT INDUSTRIES?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Structural steels; steel; steel tubes; steel fabrications; steel strip; steel masts; steel buildings; steel building materials; ramps being structures of metal; bridges (structures) of metal; fabricated metal components for building foundations; modular metallic structures; modular building units (metal-); anchors; anchors of metal; ramps of metal; masts of metal; buildings, transportable, of metal; metal building materials; metal building and construction materials; metal tubes for industrial use | ACTIVE | — |
| 007 | Agricultural, earthmoving, construction, oil and gas extraction and mining equipment; material production and processing machines; modular tools for machines; mills and crushing machines; oil drilling tools; suction pumps; suction machines for industrial purposes; suction valves for gas compressors; pumps for the extraction of gases (machines); windmills; wind turbines; cylinders for mills; windmill pumps; windmills | ACTIVE | — |
| 037 | Construction of bridges; custom construction of bridges; construction of foundations for bridges; plant construction; construction of industrial plants; beneath ground construction work relating to pipework; construction of structures for the production of crude oil; erection of structural steel constructions; construction of foundations for civil engineering structures; industrial construction; construction of steel fabrications; offshore construction; infrastructure construction | ACTIVE | — |
| 042 | Design services relating to civil engineering; technical consultancy services relating to civil engineering; engineering services for the design of structures; civil engineering; civil engineering consultancy | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 5, 2025 | FINT | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Nov 19, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 19, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 19, 2025 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Mar 31, 2025 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 31, 2025 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Nov 19, 2024 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Nov 19, 2024 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| May 28, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 7, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 7, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 2, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 1, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 16, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 7, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 3, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 2, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |