Drawing for HASSLACHER NORICA TIMBER

USPTO serial 79382569

HASSLACHER NORICA TIMBER

Reviewed by CopyMark Law Group

Reg. 7583060Status 700Registered
Filing date
Status date
Registration date
Dec 3, 2024
Examiner
STADELI, MARTA ANN
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with HASSLACHER NORICA TIMBER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael J. Leonard

Michael J. Leonard Fox Rothschild LLP212 Carnegie Center, Suite 400Princeton, NJ 08540United States

Goods and services

ClassDescriptionStatusFirst use
019Non-metallic building materials, namely, semi-worked woods, namely, wood pellets; wood, namely, glue-laminated wood, cross-laminated wood, sawn timber and structural timber; wood building materials, namely, shuttering panels of woodACTIVE—
037Construction and repair of timber buildings; Building construction information; building construction supervision; custom construction of bridges and buildings; construction of power plantsACTIVE—
042Commercial building design services; construction drafting; development, being building design of construction projects, namely, design of factory buildings, design of residential buildings; scientific energy research consultancy in relation to eco-electricity; technical consultancy in the energy sector, in particular in questions of energy efficiency, namely, technical consultancy in the fields of energy measurement to improve energy efficiency; engineering services, namely, technical project planning and design engineering in the field of designing power plant facilities and equipment to optimize efficiency of power plant operation; technological consultancy in the field of renewable energy resourcesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 28, 2025RNWLINTERNATIONAL REGISTRATION RENEWED—
May 24, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 6, 2025FICSFINAL DISPOSITION NOTICE SENT TO IB—
May 6, 2025FIMPFINAL DISPOSITION PROCESSED—
Apr 19, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 31, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 31, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 3, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 3, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Dec 3, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 1, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 1, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 11, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 28, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 28, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Aug 28, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 28, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 28, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 13, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 13, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 13, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 27, 2024RFNTREFUSAL PROCESSED BY IB—
Jun 25, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 25, 2024RFRRREFUSAL PROCESSED BY MPU—
Jun 14, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 28, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 17, 2024DOCKASSIGNED TO EXAMINER—
Nov 17, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 13, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 9, 2023LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Nov 6, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 2, 2023SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance