Drawing for VOLTPACK

USPTO serial 79382577

VOLTPACK

Reviewed by CopyMark Law Group

Reg. 8016659Status 700Registered
Filing date
Status date
Registration date
Nov 11, 2025
Examiner
MARCY, AMY ALFIERI
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with VOLTPACK?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Maurine Knutsson

Maurine Knutsson Knutsson IP ABNelinsgatan 14Norrkoping, 603 45SWEDEN

Goods and services

ClassDescriptionStatusFirst use
009Electric cables and wires; electricity measuring instruments, namely, battery measuring instruments in the nature of battery testers; electric power distribution units; electrical cells and batteries; lithium ion batteries; battery jars; battery boxes; battery leads; chargers for electric batteries; battery packs; battery testers; plates for batteries; battery separators; battery chargers; rechargeable batteries; batteries for vehicles; charging stations for electric vehicles; electric batteries for vehicles; electrical test apparatus, namely, electronic apparatus for testing batteries being battery testers, battery packs, or battery boxes; electric connection circuit boards being electrical circuit boards; solar panels for the production of electricity; electrical distribution boxes; electrical fuses; electrical monitoring apparatus for monitoring the charge of batteries in the nature of electric switches and sensors; electrical circuit boards; calculating machines, data processors, computers; downloadable computer software for monitoring, accumulating, regulating or controlling electricity, electricity consumption, charging of batteries, batteries and battery chargers; sensors; electric sensors; apparatus for eliminating static electricity; apparatus for controlling static electricity; continuity test apparatus for electrical circuits; battery terminals; battery terminal connector clampsACTIVE—
042Technological consultation services in the field of energy storage, in particular batteries, battery packs and battery boxes; technical consultancy design and development services in the nature of engineering and design services relating to batteries, battery chargers, battery characteristics, generation of electricity, electric apparatus and instruments and electric vehicles; research and consultancy, namely, technological research in the field of energy storage, consulting in the field of energy storage, in particular relating to batteries, battery packs and battery boxes; information technology consultancy; development of technologies for the protection of electronic networks; information on the measuring of battery testing equipment; industrial research in the field of energy storage, battery packs, battery boxes, and batteries; design and development of computer hardware and software; product design and development in the field of batteries, battery chargers and apparatus, instruments and cables for conducting, switching, accumulating, generating, storage, regulating or controlling electricity; scientific research in the field of energy; programming of software for others in the field of energy management and energy consumption; engineering services relating to energy supply systems; design and development of energy management software; product design and development in the field of regenerative energy generation systems; technological research in the field of energy and power needs of others; technological consultation services relating to power and energy supply; providing information about testing, monitoring and inspection of stationary batteries; providing a website featuring information in the field of testing, monitoring and inspection of stationary batteriesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 12, 2026NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 11, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 11, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Nov 11, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 23, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 23, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 17, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 22, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 19, 2025CHLDCHANGE OF OWNER RECEIVED FROM IB—
Aug 19, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 19, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 19, 2025ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
May 28, 2025CHLDCHANGE OF OWNER RECEIVED FROM IB—
Apr 19, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 31, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 31, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 18, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 19, 2025GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Feb 19, 2025GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 19, 2025CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 10, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 10, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 10, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 11, 2024RFNTREFUSAL PROCESSED BY IB—
Jul 11, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 11, 2024RFRRREFUSAL PROCESSED BY MPU—
Jun 23, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 22, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 18, 2024DOCKASSIGNED TO EXAMINER—
Nov 11, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 7, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 6, 2023LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Nov 2, 2023SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance