USPTO serial 79383160
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
John E. Ottaviani
John E. Ottaviani Partridge Snow & Hahn LLP40 Westminster St., Suite 1100Paseo de la Castellana, 259C, Planta 28Providence, RI 02903| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Solar cells; photovoltaic cells; crystalline silicon solar power cells; solar panels for the production of electricity; photovoltaic inverters; solar cells for electricity generation; photovoltaic installations for generating electricity for photovoltaic power plants, namely, solar modules for production of electricity, solar thermal and electric receivers, tracking mechanisms and concentrating optics, and control algorithms; photovoltaic apparatus for converting solar radiation to electrical energy, namely, photovoltaic solar modules; photovoltaic apparatus and installations for generating solar electricity, namely, photovoltaic thermal hybrid modules; photovoltaic solar panels for the production of electricity; solar panels for the production of electricity; electric control devices for energy management; energy control devices for heating and energy management; energy regulators being voltage regulators; downloadable software for database management; downloadable application programs for database management; downloadable home automation software for controlling networked devices in the internet of things (IoT), operating internet-enabled and connected lighting apparatus and home security alarms; wet cells; battery packs; electric batteries; uninterruptible power supply apparatus, namely, batteries; battery chargers; battery chargers for electric cars | ACTIVE | — |
| 042 | Design and development of systems for generating renewable energy; Computer programming for the energy industry; scientific research in the field of energy; energy auditing; engineering services for energy supply systems; engineering consultancy in the field of energy-saving; professional engineering consultancy relating to energy efficiency in buildings; professional engineering consultancy relating to energy-saving; programming of energy management software; engineering advisory services relating to energy consumption; engineering advisory services relating to energy efficiency; engineering consultancy relating to technological services in the field of power and energy supply; recording data for others on optical, digital and magnetic media for electronic storage relating to energy consumption in buildings; technological consultancy services in the field of alternative energy generation; technical engineering advice relating to energy-saving measures; engineering services in the field of energy technology; technological engineering analysis relating to energy and power needs of others; technological engineering consultancy in the fields of energy production and use; provision of engineering information concerning research and technical project studies engineering services relating to the use of natural energy; providing technical advice relating to energy-saving measures; conducting research and technical project studies relating to the use of natural energy; rental of meters for the recording of energy consumption; development of energy and power management systems; design and development of software for controlling, regulating and monitoring solar energy systems; computer hardware development; design and development of energy management software | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 26, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jul 5, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jul 5, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| May 3, 2025 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Apr 15, 2025 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 15, 2025 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Apr 7, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jan 7, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jan 7, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 19, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 19, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 13, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 7, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 30, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 30, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 30, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 14, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 19, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 19, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 2, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 1, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 26, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 21, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 17, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 16, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |