USPTO serial 79383320
FUTURING SMART ENERGY
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Dec 17, 2024
- Examiner
- LOZEAU, BRANDON THOMAS
- Law office
- FILE REPOSITORY (FRANCONIA)
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with FUTURING SMART ENERGY?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Kathryn Starshak
Kathryn Starshak K&L Gates LLPP.O. Box 1135Chicago, IL 60690-1135United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Downloadable computer programs for building energy forecasting and optimal management of Building Energy Management System (BEMS) operation; factory automation control machines and instruments, namely, programmable logic controllers and Human Machine Interfaces (HMI); transformers; computers for distributed control systems (DCS); Downloadable computer programs for acquiring energy consumption data and optimizing energy control; apparatus for remote meter reading of electricity meters; remote control telemetering apparatus; inverters for electricity; electrical controllers; electricity meters; electric power converters; Downloadable computer programs for managing electric power loads; electric capacitors; computers for supervisory control and data acquisition systems (SCADA); machines and instruments for controlling maximum electric power demands, namely, power control system (PCS) comprised of electronic controllers used for power conversion; solar cell panels for production of electricity; control devices for electricity accumulated by solar power, namely electronic controllers used for power conversion; programmable logic controllers; circuit breakers; solar panels for electricity generation | ACTIVE | — |
| 016 | Printed books in the fields of computers, computer software, energy, electricity, and power systems; printed booklets in the fields of computers, computer software, energy, electricity, and power systems; printed magazines in the fields of computers, computer software, energy, electricity, and power systems; printed periodicals in the fields of computers, computer software, energy, electricity, and power systems; printed catalogues in the fields of computers, computer software, energy, electricity, and power systems; printed pamphlets in the fields of computers, computer software, energy, electricity, and power systems; printed posters; printed pictorial magazines in the fields of computers, computer software, energy, electricity, and power systems; signboards of paper or cardboard; wrapping paper; semi-finished business card paper; file folders; envelope papers; printed newsletters in the fields of computers, computer software, energy, electricity, and power systems; printed plans; printed handbook manuals in the fields of computers, computer software, energy, electricity, and power systems; note paper; envelopes; printed teaching materials, except apparatus, in the fields of computers, computer software, energy, electricity, and power systems; advertisement signboards of paper or cardboard | ACTIVE | — |
| 042 | Remote monitoring of building installations via computer systems; maintenance of software for building energy consumption reduction systems; engineering consultancy in the field of prediction and optimal management of building energy usage; professional technical consultancy relating to energy efficiency in buildings; development of data processing programs; technical diagnostic services relating to energy management; advisory services relating to energy efficiency; remote diagnostic and monitoring services for electricity meters; monitoring of computer systems by remote access to ensure proper functioning; engineering services relating to electric load management; development of operating system software for comprehensive protection of power control systems; engineering services relating to comprehensive protection of power control operating systems; diagnostic services relating to power quality and technical analysis services for power systems; maintenance of computer software; design and development of electricity transmission lines and substations; development of computer programs for building energy usage prediction and optimal management of power generator and distributor operation; computer services, namely, administration of computer systems for others designed to control and maintain the optimal production of energy; development of computer programs and systems relating to acquiring energy consumption data and optimizing energy control; maintenance of computer programs relating to acquiring energy consumption data and optimizing energy control; computer services, namely, administration of computer systems for others relating to acquiring energy consumption data and optimizing energy control; engineering services relating to energy supply systems | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by LS ELECTRIC Co., Ltd.
- Other trademarks owned by LS ELECTRIC Co., Ltd.
- Other trademarks owned by LS ELECTRIC Co., Ltd.
- Other trademarks in Class 009
- Other trademarks in Class 016
- Other trademarks in Class 042
- Similar marks named FUTURING SMART ENERGY
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 21, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 31, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| May 31, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| May 3, 2025 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Apr 15, 2025 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 15, 2025 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Mar 18, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 17, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Dec 17, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 15, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 15, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 25, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 20, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 20, 2024 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 20, 2024 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 20, 2024 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 20, 2024 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 13, 2024 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jul 23, 2024 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Jul 5, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 5, 2024 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jul 5, 2024 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jul 5, 2024 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jul 5, 2024 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 27, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 27, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 27, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 21, 2024 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jun 21, 2024 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 21, 2024 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jun 21, 2024 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jun 21, 2024 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| May 22, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 30, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 30, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 20, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 19, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 18, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 21, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 17, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 16, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |