USPTO serial 79383418
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Thomas H. Curtin
Thomas H. Curtin Powley & Gibson PCSuite 220360 Hudson StreetNew York, NY 10013| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Recorded computer software for modeling railway networks and railway infrastructures; downloadable and recorded computer databases in the field of railway networks and railway infrastructures; recorded application software for modeling railway networks and railway infrastructures; electronic agendas; global positioning system (GPS) apparatus; printed circuit boards; memory cards and integrated circuit cards; blank USB flash drives; downloadable electronic digital data files featuring maps of railway networks; digital media for recorded and downloadable data, namely, pre-recorded USB flash drives and laser discs and downloadable audio and video recordings featuring railway networks and railway infrastructures. | ACTIVE | — |
| 042 | Engineering design services, namely, design of transport networks, systems, equipment and infrastructures; computer system design; software development in the framework of software publishing; development of computer platforms; software development and design; expertise being engineering consulting services in the field of transport networks, systems, equipment and infrastructures; software installation; data center installation rental, namely, rental of data center facilities; rental of computer software for modeling railway networks and railway infrastructures; Software as a Service (SaaS) services featuring software for modeling railway networks and railway infrastructures; software maintenance; providing virtual computer systems through cloud computing; updating of software; computer Platform as a Service (Paas) featuring computer software platforms for modeling railway networks and railway infrastructures; research and development of new products for third parties; engineering services in the field of evaluation of energy consumption and performance of transport networks, systems, equipment and infrastructures. | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 5, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Nov 7, 2025 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Nov 7, 2025 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Jul 22, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 3, 2025 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Apr 22, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Apr 22, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 15, 2025 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 15, 2025 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Mar 4, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 4, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 26, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 6, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 6, 2025 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Feb 6, 2025 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Feb 6, 2025 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Feb 6, 2025 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 3, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Feb 3, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 3, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 31, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 30, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 30, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 30, 2025 | NREV | NOTICE OF REVIVAL - E-MAILED | — |
| Jan 30, 2025 | PETG | PETITION TO REVIVE-GRANTED | — |
| Jan 30, 2025 | PROA | TEAS PETITION TO REVIVE RECEIVED | — |
| Jan 3, 2025 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Jan 3, 2025 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Jul 27, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 15, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 7, 2024 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Jun 20, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jun 20, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 7, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 7, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 23, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 20, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 21, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 17, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 16, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |