Drawing for RFS

USPTO serial 79383877

RFS

Reviewed by CopyMark Law Group

Reg. 7821205Status 700Registered
Filing date
Status date
Registration date
Jun 10, 2025
Examiner
CRUZADO, SAMANTHA LEE
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with RFS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Stacey Halpern

Stacey Halpern Knobbe, Martens, Olson & Bear, LLP2040 Main Street, 14th FloorIrvine, CA 92614United States

Goods and services

ClassDescriptionStatusFirst use
009Downloadable computer software for designing, planning, optimization and manufacture of structural building solutions in the field of construction; recorded computer software for the design, planning and assistance in the manufacture of structural building solutions in the field of construction; downloadable computer software for two or three-dimensional simulation for product design and development for the construction industry; downloadable computer software for the design and development of structural building elements for the construction industryACTIVE—
019Non-metallic construction materials, namely, slabs, pre-fabricated architectural columns, beams, floor panels, pre-cast concrete arches, concrete vaults, bricks, blocks; transportable buildings not of metal; prefabricated buildings, not of metal; building materials of concrete, namely, slabs, pre-fabricated architectural columns, beams, floor panels, pre-cast arches, vaults, bricks, blocks; construction materials not of metal, namely, slabs, pre-fabricated architectural columns, beams, floor panels, pre-cast concrete arches, concrete vaults, bricks, blocks; concrete building elements, namely, slabs, pre-fabricated architectural columns, beams, floor panels, pre-cast arches, vaults, bricks, blocks; modular construction materials, not of metal, namely, slabs, pre-fabricated architectural columns, beams, floor panels, pre-cast concrete arches, concrete vaults, bricks, blocks; structural elements, not of metal, for construction, namely, slabs, pre-fabricated architectural columns, beams, floor panels, pre-cast concrete arches, concrete vaults, bricks, blocksACTIVE—
042Technical development in the nature of development of new technology for structural elements for the construction industry; conducting of technical project studies for construction projects, namely, conducting scientific feasibility studies regarding construction projects; preparation of reports relating to technical project studies in the nature of scientific feasibility studies regarding construction projects; research with respect to building construction; engineering services in the field of construction technology; technical project studies being scientific feasibility studies in the field of construction; design and development of computer software for the field of construction; providing temporary use online of non-downloadable software for designing, planning, optimization and manufacture of structural building solutions in the field of construction; as a service (SaaS) services featuring software for designing, planning, optimization and manufacture of structural building solutions in the field of construction; design, maintenance and update of software for the field of construction; design, development, maintenance and update of process control software in the construction industry; design and development of software for the design, planning and manufacture of structural building solutions in the construction industryACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 29, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jan 9, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 8, 2026FIMPFINAL DISPOSITION PROCESSED—
Sep 10, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 10, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jun 10, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 9, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Apr 22, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 22, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Apr 22, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 22, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 16, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 26, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 21, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 21, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 21, 2025ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Feb 10, 2025GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Feb 10, 2025GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 10, 2025CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 20, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 20, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 20, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 20, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 20, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 20, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 15, 2024RFNTREFUSAL PROCESSED BY IB—
Jun 20, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 20, 2024RFRRREFUSAL PROCESSED BY MPU—
Jun 7, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 7, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 21, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 14, 2024DOCKASSIGNED TO EXAMINER—
Dec 31, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 1, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 27, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 23, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance