USPTO serial 79384702
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Cheryl L. Burbach
Cheryl L. Burbach HOVEY WILLIAMS LLP10801 Mastin St., Suite 1000Overland Park, KS 66210United States| Class | Description | Status | First use |
|---|---|---|---|
| 035 | business management analysis and business consultancy; business consulting services; business information services; business project management services for construction projects; business management and administration; business appraisals; sponsorship search; business investigation, business planning and provision of business information relating to start-up of business of others; copying of documents; office functions in the nature of filing of documents or magnetic tapes; providing business office functions assistance to others in the operation of data processing apparatus, namely, computers, typewriters, teleprinters, and other similar office machines | ACTIVE | — |
| 037 | Construction and renovation of buildings; construction and renovation of naval ports, commercial ports, industrial ports, fishing ports, and ferry ports; construction and renovation of airports; construction and renovation of roads; construction and renovation of bridges; machinery installation; construction of chemical or petrochemical plants, electric power plants, wind power plants, wave energy power plants, geothermal power plants, nuclear power plants, oil plants, natural gas plant, iron or steel manufacturing plants, nonferrous metal manufacturing plants, metal processing plants, machine-manufacturing plants, fiber or textile manufacturing plants, food and beverage processing plants, pharmaceutical manufacturing plants, telecommunication facilities, environment and sanitation related facilities, mining plants, receiving, storage, and offloading facilities, district air conditioning systems, automatic warehouses, pipelines and aerospace facilities; construction; construction consultancy; building construction supervision; repair of building equipment; maintenance of building equipment; repair and maintenance of chemical or petrochemical plants, electric power plants, wind power plants, wave energy power plants, geothermal power plants, nuclear power plants, oil plants, natural gas plant, iron or steel manufacturing plants, nonferrous metal manufacturing plants, metal processing plants, machine-manufacturing plants, fiber or textile manufacturing plants, food and beverage processing plants, pharmaceutical manufacturing plants, communication plants, environment and sanitation related plants, mining plants, receiving, storage and offloading facilities, district air conditioning installations, automatic warehouses, pipelines and aerospace facilities; repair or maintenance of loading-unloading machines and apparatus | ACTIVE | — |
| 042 | Architectural design; surveying; geological surveys and research; design of chemical or petrochemical plants, electric power plants, wind power plants, wave energy power plants, geothermal power plants, nuclear power plants, oil plants, natural gas plant, iron or steel manufacturing plants, nonferrous metal manufacturing plants, metal processing plants, machine-manufacturing plants, fiber or textile manufacturing plants, food and beverage processing plants, pharmaceutical manufacturing plants, telecommunication facilities, environment and sanitation related facilities, mining plants, receiving, storage, and offloading facilities, district air conditioning systems, automatic warehouses, pipelines and aerospace facilities; engineering services for the construction of chemical or petrochemical plants, electric power plants, wind power plants, wave energy power plants, geothermal power plants, nuclear power plants, oil plants, natural gas plant, iron or steel manufacturing plants, nonferrous metal manufacturing plants, metal processing plants, machine-manufacturing plants, fiber or textile manufacturing plants, food and beverage processing plants, pharmaceutical manufacturing plants, telecommunication facilities, environment and sanitation related facilities, mining plants, receiving, storage, and offloading facilities, district air conditioning system, automatic warehouses, pipelines and aerospace facilities; plant engineering; technical consultation in the field of aerospace engineering; engineering consultancy services; industrial design; technology advice, namely, technological consultancy in the fields of machines, apparatus, instruments and systems composed of such machines, used in generating power in electric power plants, generating power in nuclear power plants, telecommunication in telecommunication facilities, oil production, natural gas production, chemical and petrochemical production, iron and steel manufacturing, nonferrous metal manufacturing, fiber or textile manufacturing, metal processing, food and beverage processing, pharmaceutical manufacturing, machine-manufacturing, environmental remediation and sanitization, air conditioning systems, receiving, storage, and offloading of goods, automatic warehousing, pipelines, mining plants, telecommunications systems and computer systems, that require high levels of personal knowledge, skill or experience of the operators to meet the required accuracy in operating them; design, installation, maintenance and repair of computer software; design, creation and computer programming of web pages; monitoring of computer system operation by remote access; electronic data storage; rental of computer hardware and computer software for data processing, telecommunication, mechanical operation, logistics and inventory management; providing online non-downloadable software for computer wireless networks and wired networks including dedicated lines in the fields of data processing, telecommunication, mechanical operation, logistics and inventory management for use by application service providers; computer system analysis; research and development services in the field of chemistry; technical project planning in the field of civil engineering; research and development services in the field of engineering; research and development for others in the field of construction and urban planning; testing and research services in the field of preventing pollution; technical consultancy in the field of environmental science; scientific research in the field of energy; testing and research services relating to product development of machines, apparatus and instruments that make up or are to be used in plants; testing, technological inspection and research for others in the field of pharmaceuticals, cosmetics, foods and beverages; testing, technological inspection and research for others of industrial machines and apparatus; research and development for others in the field of innovative industrial technology; testing, technological inspection and research for others in the field of agriculture, livestock breeding and the marine products industry; research and development for others in the field of space development technology; technological consultancy in the field of aerospace engineering; research and development for others in the field of material for industrial machines and instruments; research and development for others in the field of industrial machinery technology | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 10, 2026 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 20, 2026 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 20, 2026 | FIMP | FINAL DISPOSITION PROCESSED | — |
| May 24, 2026 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Feb 24, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Feb 24, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 6, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 6, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 31, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 10, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 10, 2025 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Dec 10, 2025 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Dec 10, 2025 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Dec 10, 2025 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Dec 5, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 5, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 5, 2025 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Nov 8, 2025 | LIME | LIMITATION FROM THE IB - REQUEST EXAM REVIEW | — |
| Jun 14, 2025 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jun 14, 2025 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 14, 2025 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| May 24, 2025 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| May 6, 2025 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 6, 2025 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Apr 6, 2025 | EWAF | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | — |
| Apr 6, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 6, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 6, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Apr 6, 2025 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Apr 6, 2025 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Mar 28, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Mar 28, 2025 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Dec 28, 2024 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Oct 24, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 24, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 24, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 22, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 27, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 27, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 10, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 9, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 1, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 12, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 8, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 7, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |