Drawing for U-LEM

USPTO serial 79384771

U-LEM

Reviewed by CopyMark Law Group

Reg. 7708929Status 700Registered
Filing date
Status date
Registration date
Mar 4, 2025
Examiner
STEPHENS, BRIA MICHELLE
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with U-LEM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Gordon E.R. Troy, Esq.

Gordon E.R. Troy, Esq. Gordon E.R. Troy, PCPO Box 67Windsor, VT 05089United States

Goods and services

ClassDescriptionStatusFirst use
007Machines and equipment for chemical plants and installations for urea and melamine synthesis, namely, reactor vessels being industrial chemical reactors for chemical processing; industrial chemical reactorsACTIVE
011Evaporators for chemical processing; gas scrubbers and purification apparatus; gas scrubbers and purification apparatus being parts of gas purification installations; vacuum crystallizers being vacuum distillation apparatuses for industrial use, other than for laboratory use, being machines used for the crystallization of solutions under vacuum conditions, in order to reduce the pressure and lower the boiling point of the solvent being parts of gas purification installations; industrial effluent purification units; industrial effluent purification units being parts of gas purification installations; water purification unit parts being industrial electrolysis apparatus for generating gases being structural parts for industrial effluent purification units; filter membranes for industrial effluent purification units and reverse osmosis units; filter membranes for industrial effluent purification units and reverse osmosis units being parts of gas purification installationsACTIVE
035Business management advice in the chemical sector; commercial business project management services for construction projects in the chemical sector; procurement services for third parties in the nature of procuring of contracts for the purchase and sale of services, namely, procurement of engineering services, procurement engineering and construction services, procurement of engineering, construction and management services and procurement of contracts for purchasing goods and services for third party businesses in the chemical sector; business management services for commercial and business projects in the field of construction of chemical plants and installationsACTIVE
037Supervising being the managing of construction of chemical plants and installations; construction project management and project agreements being construction management relating to the construction of chemical plants and installations; construction, renovation and construction servicing of chemical plants and installations; advice with respect to construction, renovation and construction servicing of chemical plants and installationsACTIVE
041Services for the training and instruction of operation and maintenance staff in the field of operation, safety and maintenance for chemical plants and installationsACTIVE
042Engineering services in the chemical sector; conducting technical studies of construction projects , namely engineering services, and scientific feasibility studies in the chemical sector; research and development services in the field of melamine and urea; research services in the field of chemical processes and in the field of technology applied to chemical processes; conducting technical, namely, scientific feasibility studies in the chemical sector; conducting technical design feasibility studies in the chemical sector, namely, plants and installations design and development in the field of chemical plants and installations; services for designing chemical plants and installations; scientific and technological services, namely, scientific and engineering advice, research, scientific feasibility studies and design relating to the construction of plants and installations for producing melamine and urea; technical services in the nature of technological services, namely, scientific research and engineering assistance and advice in the field of chemical processes, the automation of chemical plants and installations, technology applied to chemical processes and relating to the operation of chemical plants and installations; scientific research services, namely, monitoring and optimizing chemical plant and installation computer systems by remote access in the nature of providing operational suggestions collecting data, enhancing operational skills, prevent failures and downtime and improve plants and installations efficiencyACTIVE
045Patent licensing being legal services; trademark licensing being legal services; licensing of industrial property rightsACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 10, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Sep 18, 2025FICSFINAL DISPOSITION NOTICE SENT TO IB
Sep 18, 2025FIMPFINAL DISPOSITION PROCESSED
Jun 4, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
May 24, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
May 6, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
May 6, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Mar 4, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 4, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED
Jan 14, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jan 14, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 8, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Dec 18, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Dec 18, 2024XAECEXAMINER'S AMENDMENT ENTERED
Dec 18, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Dec 18, 2024GNEAEXAMINERS AMENDMENT E-MAILED
Dec 18, 2024CNEAEXAMINERS AMENDMENT -WRITTEN
Dec 16, 2024DOCKASSIGNED TO EXAMINER
Dec 3, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Dec 3, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Dec 3, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 30, 2024DOCKASSIGNED TO EXAMINER
Jul 15, 2024RFNTREFUSAL PROCESSED BY IB
Jun 20, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jun 20, 2024RFRRREFUSAL PROCESSED BY MPU
Jun 7, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Jun 7, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
May 21, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 20, 2024DOCKASSIGNED TO EXAMINER
Dec 12, 2023MAFRAPPLICATION FILING RECEIPT MAILED
Dec 8, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Dec 7, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance