USPTO serial 79385235
CORE-H
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Sep 17, 2024
- Examiner
- KERTGATE, AMY L
- Law office
- FILE REPOSITORY (FRANCONIA)
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with CORE-H?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jason L DeFrancesco
Jason L DeFrancesco DeFrancescoLaw110 Dungannon Blvd., Ste 101WILMINGTON, NC 28403United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Solar-powered electricity generators; portable electric power generators; alternators; power supply devices, namely, electric generators, solar-powered electricity generators; carbon brushes for conducting electricity, namely, electrically conductive carbon brushes being parts of motors; solar powered electricity generators; current generators; electric power generators for ships; electric power generators for emergency use; mobile electrical power generators; electric generators using solar cells; electrostatic generators; engines for generating electricity; power stations, namely, solar-powered power stations for the generation of electricity, portable power stations in the nature of mobile electric power generators | ACTIVE | — |
| 009 | Photovoltaic solar panels for the production of electricity; solar arrays, namely, photovoltaic solar modules for production of electricity; solar energy systems comprising photovoltaic solar panels for the production of electricity; electronic tracking controllers for controlling photovoltaic solar panels for the production of electricity and electronic mechanisms in the nature of closed- loop controller for orienting solar panels; photovoltaic solar modules for production of electricity; solar cells; solar panels for the production of electricity; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar modules; electric current testing apparatus for use in the photovoltaic industry, namely, pulse generators; calibrated photovoltaic reference cells; inverters for electricity; accumulators in the nature of batteries; solar batteries; battery chargers; protective glass cover specially adapted for solar modules; downloadable, recorded, downloadable and recorded business technology software for the control of photovoltaic systems | ACTIVE | — |
| 042 | Research and development, design of apparatus and machines, engineering and related consulting services for others, all in the field of solar energy; design and development of energy distribution networks; engineering services in the field of energy technology; design and development of software for control, regulation and monitoring of solar energy systems; conducting research and technical project studies relating to the use of natural energy; consultancy relating to technological services in the field of power and energy supply; testing, authentication and quality control services for others in the fields of electricity and energy; IT consulting services relating to installation, maintenance and repair of computer software; engineering design services; design of computer hardware for the manufacturing industries; creation, maintenance and adaptation of software; creation of control programs for automated measurement, assembly, adjustment, and related visualisation; creation of control programs for electric operation control and drive modules; creation, updating and adapting of computer programs; design and development of computer game software and virtual reality software; design and development of computer software for evaluation and calculation of data; design of virtual reality software; development of computer hardware and software; providing technological and scientific research information about environmentally-conscious and green innovations; development of technologies for the protection of electronic networks; design of information technology infrastructure for others; scientific research in measurement technology; computer and information technology consultancy services; engineering services in the field of environmental technology; consulting and information services relating to information technology architecture and infrastructure | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by 3Sun S.r.l.
- Other trademarks owned by 3Sun S.r.l.
- Other trademarks owned by 3Sun S.r.l.
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 042
- Similar marks named CORE-H
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| May 31, 2025 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| May 13, 2025 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 13, 2025 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Mar 15, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 26, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 26, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Dec 20, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 17, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Sep 17, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 28, 2024 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 2, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 2, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 1, 2024 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jun 14, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 13, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 12, 2024 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jun 12, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 28, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 24, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 23, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 23, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 2, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 14, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 14, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Feb 22, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 21, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 16, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 16, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 19, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 15, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 14, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |