Drawing for COMTEST

USPTO serial 79388439

COMTEST

Reviewed by CopyMark Law Group

Status 645Office Action
Filing date
Status date
Registration date
—
Examiner
AGREDA, SAMANTHA LEIGH
Law office
TMO LAW OFFICE 123

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 645: Status 645 means the USPTO mailed a final refusal maintaining at least one objection to your application. You can respond, appeal to the Trademark Trial and Appeal Board, or allow the application to abandon.

Need help with COMTEST?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Alexander Lazouski

Alexander Lazouski Lazouski IP LLC14726 Bowfin Terrace, Suite 1Lakewood Ranch, FL 34202United States

Goods and services

ClassDescriptionStatusFirst use
006Building panels, doors, building frames, and shutters, all made of metal, including, namely, doors and panels that seal off acoustic, fire-hazardous, and medical spaces, doors and panels that seal off dust-free spaces, and airtight and non-airtight doors, all made of metal; movable metal structures being transportable metal constructions; metal enclosures being metal casings and metal casings for industrial use, including, namely, machine enclosures, test chambers, and soundproof booths, all being transportable metal structures constructions; Faraday cages; Faraday tents; metal shielded rooms[ structures] being metal enclosures that block electromagnetic interference (EMI) to protect electronic devices from RF waves and electromagnetic radiation incorporating EMI protection; metal shielded rooms[ structures] being metal enclosures that block electromagnetic interference (EMI) to protect electronic devices from RF waves and electromagnetic radiation incorporating tempest shielding; metal shielded rooms[ structures] being metal enclosures that block electromagnetic interference (EMI) to protect electronic devices from RF waves and electromagnetic radiation incorporating magnetic shielding for low frequencies; metal shielded rooms[ structures] being metal enclosures that block electromagnetic interference (EMI) to protect electronic devices from RF waves and electromagnetic radiation incorporating echo-free function; all the aforementioned materials made of metal; metal building materials, namely, metal partitionsACTIVE—
035Retail store or and wholesale store services, whether or not including online retail store and wholesale store services, all in the field of materials for absorbing electromagnetic waves made of carbon-loaded closed-cell polystyrene; retail store or and wholesale store services, whether or not including online retail store and wholesale store services, all in the field of polystyrene absorbent products, electromagnetic plates for shielding or absorbing electromagnetic waves for use in test chambers, soundproof booths, Faraday cages, EMI shielded rooms, tempest rooms, and echo-free rooms; retail store or and wholesale store services, whether or not including online retail store and wholesale store services, all in the field of panels, doors, frames, and shutters, doors and panels that seal off acoustic, fire-hazardous, and medical spaces, and doors and panels that seal off dust-free spaces; retail store or and wholesale store services, whether or not including online retail store and wholesale store services, all in the field of movable metal structures, enclosures and casings made of metal for industrial machines for industrial use and machine enclosures; retail store or and wholesale store services, whether or not including online retail store and wholesale store services, all in the field of test chambers, soundproof booths, Faraday cages, Faraday tents, EMI shielded rooms, tempest rooms, magnetic shielding for low frequencies, echo-free rooms, scientific and electrical apparatus and instruments, weighing, measuring, and control (inspection) apparatus and instrumentsACTIVE—
037Construction, namely, building construction; installation, repair, and maintenance of industrial installations machinery, walls, panels, doors, door hardware, insulation materials, air conditioning systems and instrumentation systems being scientific and laboratory apparatus; construction supervision, including in the field of enclosures for industrial machines for industrial use, including machine enclosures, test chambers, soundproof booths, as well as enclosures and casings for refrigeration, freezing, and air conditioning installations and industrial machines, Faraday cages, Faraday tents, EMI shielded rooms, tempest rooms, magnetic shielding for low frequencies and echofree rooms; the aforementioned services whether or not provided through electronic means, including via the internetACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 10, 2026GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Aug 10, 2026GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 10, 2026CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 14, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 14, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 14, 2026ALIEASSIGNED TO LIE—
May 7, 2026ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Aug 20, 2025RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Aug 19, 2025RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Jul 18, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jul 1, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 1, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Feb 18, 2025GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Feb 18, 2025GNSLLETTER OF SUSPENSION E-MAILED—
Feb 18, 2025CNSLSUSPENSION LETTER WRITTEN—
Jan 21, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 21, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 21, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 17, 2024RFNTREFUSAL PROCESSED BY IB—
Aug 16, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 23, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 23, 2024RFRRREFUSAL PROCESSED BY MPU—
Jun 26, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 25, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 20, 2024DOCKASSIGNED TO EXAMINER—
Feb 6, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Feb 2, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 1, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance