USPTO serial 79389021
GREEN STEAM
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- —
- Examiner
- GULIANO, ROBERT N
- Law office
- TMEG LAW OFFICE 105
What this means
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
Need help with GREEN STEAM?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Geothermal steam for industrial purposes (term considered too vague by the International Bureau -rule 13 (2) (b) of the Regulations); steam for industrial purposes (term considered too vague by the International Bureau -rule 13 (2) (b) of the Regulations); industrial gases; heat generating chemical compounds; heat transfer fluids; radiator and cooling system flush; gases for use in thermal treatment | ACTIVE | — |
| 009 | Thermal energy or electricity storage apparatus; modular thermal blocks for the storage of energy and electricity; thermal energy storage blocks; thermal storage apparatus for storing energy associated with, but not limited to, photovoltaic, wind, concentrated solar thermal, bioenergy, fossil fuels, geothermal, tidal, wave, hydroelectric, biomass, renewable and nuclear energy sources; energy storage apparatus; energy storage apparatus for storing energy associated with, but not limited to, photovoltaic, wind, concentrated solar thermal, bioenergy, fossil fuels, geothermal, tidal, wave, hydroelectric, biomass, renewable, and nuclear energy sources; energy control devices; apparatus for managing energy supplies; devices for measuring energy; electrical apparatus (other than generators) for use in energy supply; energy regulators; apparatus for collecting and storing energy including apparatus for collecting and storing surplus energy for future distribution; thermal energy measuring apparatus; energy storage apparatus (batteries) including industrial and commercial electrical storage (batteries); thermal storage instruments for energy generation; apparatus for heavy current electrical engineering; apparatus for low-power electrical engineering; switch boxes for use in electrical engineering; energy supply apparatus (other than generators) for supplying energy associated with, but not limited to, photovoltaic, wind, concentrated solar thermal, bioenergy, fossil fuels, geothermal, tidal, wave, hydroelectric, biomass, renewable and nuclear energy sources; thermal storage apparatus for use in power generation, advanced power cycles, synthetic fuels, hydrogen production, voltage regulation, frequency control, combined cycle gas turbines and fast start energy systems; uninterrupted power supply apparatus; switching power supply apparatus; static energy supply units; reserve energy supply apparatus (other than generators); energy generating apparatus, namely, energy generating apparatus associated with photovoltaic and solar energy sources in this class | ACTIVE | — |
| 011 | Apparatus for steam generating; thermal storage apparatus for heating including thermal storage apparatus for energy associated with, but not limited to, photovoltaic, wind, concentrated solar thermal, bioenergy, fossil fuels, geothermal, tidal, wave, hydroelectric, biomass, renewable and nuclear energy; uninterruptible steam, hydrogen, gas and nuclear power generating installations; nuclear power plants; industrial heating apparatus; steam producing installations; heating systems for residential and commercial building; thermal storage apparatus for heating including such goods used in relation to power generation, advanced power cycles, synthetic fuels, hydrogen production, voltage regulation, frequency control, combined cycle gas turbines and fast start energy systems; energy generating apparatus, namely, energy generating apparatus associated with nuclear energy sources and solar energy sources in this class | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 5, 2025 | FINT | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Nov 20, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 20, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 26, 2025 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jul 7, 2025 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 7, 2025 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Nov 20, 2024 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Nov 20, 2024 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| May 28, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 8, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 8, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 2, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 1, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 24, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 16, 2024 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Feb 12, 2024 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 9, 2024 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |