USPTO serial 79389634
NODEA
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Dec 24, 2024
- Examiner
- STURMAN, MELISSA M
- Law office
- FILE REPOSITORY (FRANCONIA)
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with NODEA?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Theodore R. Remaklus
Theodore R. Remaklus Thompson Hine LLP312 Walnut Street, Suite 2000GranTokyo South Tower, 1-9-2,Cincinnati, OH 45202-4024Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal materials for building or construction, namely, metal reinforcement materials, metal cladding, metal building flashing, metal pre-fabricated balconies; building materials, namely, composite panels composed primarily of metal; metal building material, namely, fascia and soffits; metal building materials, namely, ceiling boards and floor boards; stair nosing of metal being building materials; doors of metal; window sashes of metal; metal curtain walls; shutters of metal; metal siding; prefabricated building assembly kits of metal; metal hardware, namely, nuts, screws and washers; security locks of metal, other than electric; split rings of common metal for keys; metal keys for locks; padlocks of metal, other than electronic; metal nameplates and door nameplates; letter boxes of metal; towel dispensers of metal; metal joinery fittings; metal safes; outdoor blinds of metal; upright signboards of common metal; door stops of metal; bicycle parking installations of metal; hinge pin door closers of metal; spring-loaded door closers of metal; insect screens of metal | ACTIVE | — |
| 019 | Non-metal building materials, namely, fiberglass panels, floor boards, fascia and soffits; building materials, namely, manufactured brick veneer for use on interior and exterior walls, floors and surfaces, patios, poolsides and driveways; building materials, namely, composite panels composed primarily of nonmetal materials; building materials, namely, semi-worked woods; building materials, namely, cellular PVC trim; building materials, namely, plastic pipe supports; cork tiles and tiles of cork-based conglomerates being building materials for floors, walls and ceilings; terra-cotta for use as building materials; stair nosing not of metal being building materials; ceiling boards of wood; non-metal doors; non-metal window sashes; non-metal curtain walls; non-metal building products, namely, shutters, shingles, siding, and trim; construction materials, namely, non-metal flooring materials; construction material, namely, fiberglass panels and boards; construction material, namely, nonmetal exterior panels and boards; construction materials, namely, nonmetal toilet partitions; construction materials, namely, non-metal piles; non-metallic minerals for building or construction; ceramic building materials in the nature of ceramic wall tiles, ceramic floor tiles and ceramic ceilings tiles; bricks; plastic building materials, namely, pipe supports, multilayer panels, plastic wallboards, plastic floorboards and plastic window sashes; synthetic building materials, namely, synthetic boards for building purposes, synthetic flooring materials or wall-claddings or synthetic window sashes; asphalt; asphalt for building purposes; asphalt-based coatings and sealants for use on roofs, walls and pavements; rubber building or construction materials, namely, flooring, cove bases and stairway warning tiles; plaster for building purposes; lime building materials; non-agricultural lime for use in construction; construction materials of plaster being plaster; construction materials of plaster being plaster boards; construction materials of plaster being facing plaster; prefabricated buildings, not of metal; cement and its products, namely, tiles for walls or floors; non-metal building products, namely, siding materials of ceramic based cement being siding; building timber; building stone; building glass; letter boxes of masonry; outdoor blinds, not of metal or of textile; bicycle parking installations, not of metal; insect screens, not of metal | ACTIVE | — |
| 037 | Building construction; providing construction information; construction consultancy; building construction supervision; maintenance of building equipment; repair or maintenance of loading-unloading machines and apparatus; repair of electronic machines; repair or maintenance of telecommunication machines and apparatus; repair or maintenance of telephone apparatus; repair or maintenance of consumer electric appliances; repair or maintenance of electric lighting apparatus; repair or maintenance of measuring and testing machines and instruments; repair or maintenance of medical machines and apparatus; repair or maintenance of mechanical parking systems; repair or maintenance of bicycle parking apparatus; furniture restoration; safe maintenance or repair; setup or repair of locks; repair or maintenance of gas water heaters; repair or maintenance of non-electric cooking heaters; repair or maintenance of cooking pots and pans; repair or maintenance of bath fittings; repair of toilet stool units with a washing water squirter; repair of tatami mats; cleaning of building exterior surfaces; window cleaning; carpet and rug cleaning; floor polishing; bathtub and bath boiler cleaning | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by LIXIL Corporation
- Other trademarks owned by LIXIL Corporation
- Other trademarks owned by LIXIL Corporation
- Other trademarks in Class 006
- Other trademarks in Class 019
- Other trademarks in Class 037
- Similar marks named NODEA
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 1, 2025 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jul 14, 2025 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 14, 2025 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jul 5, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 17, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 17, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 25, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 24, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Dec 24, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 22, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 22, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 2, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 12, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 11, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 11, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 11, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 16, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 26, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 26, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 6, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 5, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 5, 2024 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Feb 28, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 28, 2024 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 23, 2024 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Feb 15, 2024 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |