Drawing for VIROC

USPTO serial 79391773

VIROC

Reviewed by CopyMark Law Group

Reg. 7749302Status 700Registered
Filing date
Status date
Registration date
Apr 8, 2025
Examiner
OGUNFEMI, RASHEEDAT
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with VIROC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Paul Cosmovici

244 Fifth Avenue, 2nd Floor # suite-1279New York City, NY 10001United States

Goods and services

ClassDescriptionStatusFirst use
019Monuments, not of metal; concrete panels; boards made of wood particles; non-metallic hoarding panels; building panels incorporating acoustic installation, not of metal; wood panelling; fencing panels, non-metallic; building panels, not of metal; Building material, namely, particle boards; wooden floor boards; wall linings, not of metal, for building; ceiling boards, not of metal; fibreboard for building; fiberboard in the nature of building materials; partitions, not of metal being building materials; space dividing structures, not of metal, namely partitions for building; partitions being non-metallic building materials; Fireproof cementitious protective coatings; cements for building; ready-to-use cement for building purposes; Building materials, namely, cementitious waterproofing coatings; fireproof cement coatings; Asphalt-based coatings for use on concrete; cladding board, non-metallic, for building; cladding materials, namely, wall claddings, non-metallic, for building; Building materials, namely, bituminous roof coatings; roofing underlayment; Roof coverings, not of metal, for building; flashing, not of metal, for building; suspended ceiling systems, comprising panels, non-metallic; fibre boards of wood fibre bonded with resin and particle boards; wall panelling made of non-metallic materials; prefabricated non-metal walls; Prefabricated non-metal walls, namely, interior walls of non-metallic materials; Prefabricated walls, non-metallic; Prefabricated non-metal walls, namely, moveable walls made of non-metallic materials; Partitions being non-metallic building materials, namely, spacers being building elements made of fibre reinforced cement; wood-fiber reinforced cement boards, namely, cement excelsior boards; concrete floors; laminate flooring, not of metal; concrete walls for building; cladding, non-metallic, for building, namely, for ceilings; non-metal decking; Facade panels, for construction purposes, non-metallic; Facade panels, for construction purposes, non-metallic, in the nature of building fronts; Building materials, namely, cladding, non-metallic, for facades; facade construction components, non-metallic, namely, facade panelsACTIVE—
037Construction of buildings, namely, public facilities; erecting of housing areas; construction of public works buildings; building of shops; construction and demolition of buildings; Building construction information; construction of parts of buildings, namely, chimneys; provision of construction information; building construction supervision; Building construction services; building sealing; Construction of civil engineering structures; residential and commercial building construction; general building contractor services; construction of buildings and homes; erection of structures in the nature of formwork for use in building and construction; building construction consultancy; advisory services relating to the construction of buildings and homes; consultancy, information and advisory services relating to the construction of public works buildings; installation of coloured drywall panels in building fascias; erection of structures in the nature of curtain walls; construction of curtain wallsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 30, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 20, 2025XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Oct 20, 2025XXCRGENERIC MADRID TRANSACTION CREATED—
Sep 5, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Aug 20, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 20, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jul 8, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 8, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 8, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Apr 8, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 31, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 31, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 31, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 18, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 18, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 15, 2025RFNPREFUSAL PROCESSED BY IB—
Feb 12, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 23, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 20, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 20, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 20, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 14, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 25, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 25, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 25, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 12, 2024RFNTREFUSAL PROCESSED BY IB—
Sep 25, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 24, 2024RFRRREFUSAL PROCESSED BY MPU—
Sep 22, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 21, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 29, 2024DOCKASSIGNED TO EXAMINER—
Mar 26, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Mar 22, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 21, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance