Drawing for EVIOS

USPTO serial 79393399

EVIOS

Reviewed by CopyMark Law Group

Reg. 7764494Status 700Registered
Filing date
Status date
Registration date
Apr 22, 2025
Examiner
KING, LINDA M
Law office
Historical data usage

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with EVIOS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Rebecca Liebowitz

Rebecca Liebowitz Venable LLPPO Box 34385Washington, DC 20043-9998United States

Goods and services

ClassDescriptionStatusFirst use
007Machines for manufacturing batteries; cleanroom-capable production machines for battery manufacture; machines and machine tools for plastic, paper, metal or paper and plastic compound material processing and production; industrial robots, namely, pick and place machines; parts and attachments for machines for processing web material, namely, bobbin changing devices and apparatus; cutting machines; web cross-cutting machines; web slitting machines; punching machines; stacking machines; industrial paper folding machines; industrial paper Z-folding machines; electrode insertion machines; laminating machines for industrial use; industrial robots; pneumatic, hydraulic, mechanical or electrical control mechanisms for machines or engines; belt conveyors; web conveyors being machines; compressed air conveyors being machines; conveyor belts; conveyor chains; machine parts, namely, conveyor drums; conveyors being machines; pneumatic conveyors and mechanical conveyors being machines; hydraulic web accumulators being machine parts; hydraulic belt accumulators being machine parts; storage magazines for electrode sections, for separator sections, for monocells made of electrode sections and separator sections, being machine parts; winding machines for manufacturing batteries from electrode webs and separator webs; packaging machines; banderoling packaging machines; pneumatic transporters, namely, bobbin transport machines; machine parts, namely knives, counter blades, drums, valves, sealings, bearings, roller bearings, friction bearings, conveyor belts, band conveyorsACTIVE—
009Testing machines for testing electrical voltage, electrical current, electrical resistance, presence of impurities on surfaces, on edges, cutting edge contour, defects on cutting edges, elevations and depressions on surfaces, web tension, web position and edge position; measuring instruments for * product testing in machines for * measuring electrical voltage, electrical current, electrical resistance, presence of impurities on surfaces, on edges, cutting edge contour, defects on cutting edges, elevations and depressions on surfaces, web tension, web position and edge position; electric sensors for * testing and measuring instruments, * infrared sensors for * testing and measuring instruments, * electric microwave sensors for testing and measuring instruments; optical inspection apparatus for * testing and measuring instruments; * metal detectors; lasers, not for medical purposes, for testing and measuring instruments; weighing apparatus and instruments; weighing machines; electric current control devices, electricity distribution consoles, and electric control panels; apparatus and instruments for controlling the distribution or use of electricity; electric cables and conductors; electric and electronic components in the nature of voltage transducers, current transducers, resistance measuring devices, optical elements, lenses and lighting elements for * testing and measuring instruments; * electrical circuits and electrical circuit boards for testing and measuring instruments; electric communication apparatus, namely, modems; electrical sensors for * testing and measuring instruments; * electrical controllers, electrical testing apparatus, namely, testing apparatus for testing electrical voltage, electrical current, electrical resistance, presence of impurities on surfaces, on edges, cutting edge contour, defects on cutting edges, elevations and depressions on surfaces, web tension, web position and edge position; electronic monitors and monitor modules for monitoring electric current and electrical signals; weighing instruments, measuring instruments for measuring electrical voltage, electrical current, electrical resistance, presence of impurities on surfaces, on edges, cutting edge contour, defects on cutting edges, elevations and depressions on surfaces, web tension, web position and edge position; counters for counting cuts of cross cutters and for counting stacked sections; alignment machines for aligning web material and electrode sections; calibrating devices for calibrating sensors for measuring electrical voltage, electrical current, electrical resistance, presence of impurities on surfaces, on edges, cutting edge contour, defects on cutting edges, elevations and depressions on surfaces, web tension, web position and edge position; electric installations for the remote control of industrial operations; apparatus and instruments for regulating electric current; robotic electrical controllers; batteries, electric accumulators; galvanic cells; cameras; data processing equipment; electronic data loggers and recorders; computer storage devices, namely, high-speed storage subsystems for storage and backup of electronic data either locally or via a telecommunications network; electronic database in the field of battery manufacture recorded on computer media; downloadable and recorded computer software for battery manufactureACTIVE—
035Advertising; commercial business management; business administration; negotiation of commercial transactions for others, including within the framework of e-commerce; procurement services for others, namely, purchasing machines for manufacturing batteries, and machines for servicing batteries for other's businesses; providing a website used to place on-line commercial orders in the field of machines and servicing and rental thereof and electronic processing of orders for others, also within the framework of e-commerce * ; all the aforementioned services in the field of development and manufacture of batteries *ACTIVE—
037Installation, repair, cleaning, maintenance and repair of machines, apparatus and installations used in the manufacture of batteries; Providing information relating to the installation of machines; providing information relating to the repair or maintenance of machines and equipment for the manufacture of batteriesACTIVE—
040Rental of apparatus and machines for battery manufacture; powder coating, electrophoretic coating, slurry coating and paste coating of material webs; contract manufacturing of batteries for others; laminating electrode webs and separator webs; custom manufacture of electrode/separator stacks with Z-folded separator and inserted electrodes; custom manufacture of electrode/separator stacks with monocells made of alternatingly stacked electrode sections and separator sections; custom manufacture of electrode/separator stacks with laminable separator materialACTIVE—
042Engineering design services in the field of development and manufacture of batteries; engineering services; providing technology information in the field of battery production; engineering services for the purpose of process optimization and relating to automation of machines for battery production; design, development, updating and maintenance of computer software; programming of computer software for others for evaluating and calculating data; computer software consulting; computer programming; providing an interactive website featuring technology that allows users to enter, access, and synthesize information and generate reports for use in consulting with executives and businesses; research in the field of mechanical engineering; quality control for others; testing, analysis and evaluation of goods and services of others to determine conformity with certification standards; technical advice relating to the operation of computers and to battery manufacture; engineering services, particularly technical project planning and design engineering of machines and related computer hardware and software for battery manufacture; transfer of technical know-how through technical consultancy, namely, consultancy in the field of development and manufacture of battery and related computer hardware and software; design, development and maintenance of computer software for apparatus and installations for battery manufactureACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 25, 2026NURCNOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED—
Aug 5, 2026COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Dec 2, 2025NURCNOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED—
Nov 30, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 12, 2025FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 12, 2025FIMPFINAL DISPOSITION PROCESSED—
Nov 12, 2025LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
Nov 12, 2025LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
Nov 12, 2025COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Nov 12, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Sep 27, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Sep 22, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Sep 10, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 10, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jul 23, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 12, 2025ES7RTEAS SECTION 7 REQUEST RECEIVED—
May 15, 2025CHPNPOST PUBLICATION AMENDMENT – NOT ENTERED—
May 13, 2025APETASSIGNED TO PETITION STAFF—
Apr 22, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Apr 22, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 1, 2025EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
Mar 8, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 8, 2025ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Mar 8, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 8, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Mar 4, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 4, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 26, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 6, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 6, 2025XAECEXAMINER'S AMENDMENT ENTERED—
Feb 6, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 6, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 6, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 4, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 4, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 4, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 24, 2025ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jan 21, 2025PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jan 7, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 3, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 3, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 3, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 8, 2024LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Oct 11, 2024LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Aug 4, 2024RFNTREFUSAL PROCESSED BY IB—
Jul 5, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 5, 2024RFRRREFUSAL PROCESSED BY MPU—
Jun 15, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 5, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 29, 2024DOCKASSIGNED TO EXAMINER—
Apr 18, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 12, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 11, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance