Drawing for SAIGE SAFETY

USPTO serial 79393718

SAIGE SAFETY

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
WU, KRISTEN ZAHNOW
Law office
TTAB

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 604: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with SAIGE SAFETY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

SANG YOON KANG

SANG YOON KANG STUDEBAKER BRACKETT, PLLC8255 GREENSBORO DRIVESUITE 300TYSONS, VA 22102

Goods and services

ClassDescriptionStatusFirst use
009Downloadable software for remotely monitoring construction processes at construction work sites; downloadable computer software for managing and monitoring the supply of construction materials, tools and equipment at construction work sites; downloadable computer software for generating reports regarding the supply of construction materials, tools and equipment at construction work sites; downloadable software for remotely monitoring the use and operation of equipment at construction sites; downloadable software for remotely monitoring construction processes at construction sites and detecting abnormalities in the use and operation of equipment; downloadable software for the remote observation of construction processes at construction sites; downloadable industrial software for remotely monitoring construction processes at industrial sites; downloadable software for detecting industrial site hazards, hazardous gases and fire, and the unauthorized entry of personnel at industrial sites; downloadable software for remotely monitoring the perimeters of construction and industrial sites and providing notifications regarding unauthorized entry of individuals; downloadable software for controlling and monitoring the operation of equipment in construction sites; downloadable construction site software for monitoring and controlling communication between computers and automated machine systems, data recording and data collection; downloadable computer simulation software for modeling electronic circuits at construction sitesABANDONED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 24, 2025MAB4ABANDONMENT NOTICE E-MAILED - INTER PARTES DECISION—
Nov 24, 2025ABN4ABANDONMENT - AFTER INTER PARTES DECISION—
Nov 24, 2025OP.TOPPOSITION TERMINATED NO. 999999—
Nov 24, 2025OP.SOPPOSITION SUSTAINED NO. 999999—
Oct 18, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Sep 19, 2025RFNTREFUSAL PROCESSED BY IB—
Sep 17, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 17, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Aug 26, 2025ETOPEXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED—
Aug 26, 2025OP.IOPPOSITION INSTITUTED NO. 999999—
Aug 25, 2025OPNSOPPOSITION NOTICE (IB REFUSAL) SENT TO IB—
Aug 25, 2025OPNCOPPOSITION NOTICE (IB REFUSAL) CREATED—
Mar 26, 2025ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Feb 25, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 25, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 19, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 30, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 29, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 29, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 29, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 14, 2024RFNTREFUSAL PROCESSED BY IB—
Aug 27, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 27, 2024RFRRREFUSAL PROCESSED BY MPU—
Aug 23, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 22, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 21, 2024DOCKASSIGNED TO EXAMINER—
Apr 23, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 19, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 18, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance