USPTO serial 79393825
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Holiday W. Banta
Holiday W. Banta Ice Miller LLPOne American Square, Suite 2900Indianapolis, IN 46282United States| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Common metals and their alloys; transportable buildings of metal; reinforcing materials of metal for railway tracks; non-electric cables and wires of common metal; ironmongery and small items of metal hardware, namely, elbow joints for pipes, crossovers for pipes, pipe couplings, pipe tees, pipe reducers, plugs, pipe adaptors, flanged pipe joints, pipe joints, pipe valve connectors; pipes and tubes of metal; safes; hardware of common metal, namely, elbow joints for pipes, crossovers for pipes, pipe couplings, pipe tees, pipe reducers, plugs, pipe adaptors, flanged pipe joints, pipe joints, pipe valve connectors; grease nipples; water-pipe valves of metal; drain traps in the nature of valves of metal; alloys of common metal; common metals, unwrought or semi wrought; water pipes of metal; soldering wire of metal; rods of metal for welding, valves of metal, other than parts of machines; wire of common metal; ring-shaped fittings of metal; nuts of metal; elbows of metal for pipes; pipe muffs of metal; chains of metal; couplings of metal for chains | ACTIVE | — |
| 011 | Apparatus for lighting purposes, namely, lighting apparatus in the nature of lighting installations; heating units for industrial purposes; steam generating installations; apparatus for the exchange of substances and heat for use in the production of steam, for use in cooking and for use in refrigeration; refrigerating machines and installations; drying apparatus for use in heating, ventilation systems, air conditioning systems and refrigeration systems; ventilating fans for commercial and industrial use; taps for pipes and pipelines being parts of sanitary installations, other than barrel taps and parts for machines or motor engines; water-pipes for sanitary installations, namely, flexible pipes being parts of sink plumbing installations; water purification installations; water level controlling valves in tanks; steam generating installations; steam generators | ACTIVE | — |
| 017 | Raw or semi-worked latex rubber; gutta-percha; asbestos; mica; plastics in extruded form for use in manufacture; packing, stopping, and insulating materials; flexible pipes, not of metal; tube joints made of plastic for use in manufacturing; junctions, not of metal, for pipes | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 3, 2025 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Sep 27, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 17, 2025 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 17, 2025 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Sep 4, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 4, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| May 26, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Feb 25, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Feb 25, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 7, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 7, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 1, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 11, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 12, 2024 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 12, 2024 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 12, 2024 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Nov 8, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 8, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 8, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 28, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 9, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 9, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 3, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 2, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 30, 2024 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 27, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 26, 2024 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 24, 2024 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Apr 18, 2024 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |