Drawing for NEXITE

USPTO serial 79394540

NEXITE

Reviewed by CopyMark Law Group

Reg. 8258086Status 700Registered
Filing date
Status date
Registration date
May 19, 2026
Examiner
O'BRIEN, JENNIFER LYNN
Law office
Historical data usage

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with NEXITE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Ee Ming T. Bahk

Ee Ming T. Bahk Oliff PLCP.O. Box 320850Alexandria, VA 22320-4850United States

Goods and services

ClassDescriptionStatusFirst use
019Pre-fabricated irrigation and drainage products for collecting and draining water, surface water, waste water and other liquids, in particular for channel drainage, point drainage or surface drainage, namely, Ceramic drain pipes, Concrete drainage structures, namely, trench drains, Non-metal water pipes; drainage channels, in the nature of concrete drainage structures, namely, trench drains, Nonmetallic construction materials, namely, drain bases and grates in the nature of inlet boxes and containers and intermediate containers, throttle shafts being water-pipe valves, not of metal or plastic, catch basins for attachment to sewer pipes to trap debris, downspout boxes being parts of downspouts, sludge traps in the nature of plastic oil and debris trap for storm drainage, Concrete drainage structures, namely, storm manholes in the nature of prefabricated inspection chambers, floor drains with and without odour traps being drain pipes, covers, cover gratings, cover grilles, cover plates, manhole covers with and without perforations, dirt collection sieves and rakes in the nature of debris guards for gutters, wall and window feedthroughs for pipes in the nature of rigid pipes, not of metal, for building, none of the aforesaid consisting of metal; drainage plates in the nature of non-metal gratings; shaped parts of plastic for the drainage of buildings, ventilating and aeration grids, interior and exterior hoods, namely, non-metallic drainage pipes, Plastic conduit for drainage, Gratings, not of metal, for ventilation openings; prefabricated construction parts for the construction of inspection chambers, flushing shafts and collection pits in drainage installations, namely, non-metallic drainage pipes, infiltration trenches and components for infiltration trenchesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 15, 2026NURCNOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED—
Aug 27, 2026COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Aug 24, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 19, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 24, 2026CHPNPOST PUBLICATION AMENDMENT – NOT ENTERED—
Jun 24, 2026APETASSIGNED TO PETITION STAFF—
Jun 9, 2026ES7RTEAS SECTION 7 REQUEST RECEIVED—
May 19, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
May 19, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
May 19, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 5, 2026EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
Apr 23, 2026ETOPEXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED—
Oct 22, 2025ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Oct 14, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 14, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 10, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Oct 8, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 24, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 24, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Sep 16, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 15, 2025XAECEXAMINER'S AMENDMENT ENTERED—
Sep 15, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 15, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 15, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 6, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 6, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 6, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 31, 2025RFNTREFUSAL PROCESSED BY IB—
May 14, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 14, 2025RFRRREFUSAL PROCESSED BY MPU—
May 2, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 1, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 19, 2025DOCKASSIGNED TO EXAMINER—
Apr 18, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 18, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 25, 2024SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance