Drawing for SOLFARM

USPTO serial 79394938

SOLFARM

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
NEAL, KELLY L
Law office
TMEG LAW OFFICE 105

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with SOLFARM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Common metals and their alloys; building and assembly materials of metal; sheets, rods, pipes and profiles of metal, in particular extruded profiles of light metal; mounts, fastening and connecting parts of metal for construction and assembly purposes; buildings of metal, including transportable buildings; roofs, exhibition stands and stage sets of metal; roofs of metal with integrated solar cells; frameworks of metal for construction and assembly purposes; frameworks for photovoltaic installations; small items of metal hardware and goods of metal for construction purposes; roof ladders, roof steps and roof hooks of metal; posts and supports of metal; containers, transport pallets and crates of metal; ironmongery, small items of metal hardware; fittings of metal for building and furniture.ACTIVE—
007Machine tools; motors (except motors for land vehicles); machine coupling and transmission components (except for land vehicles); electrical generators; electrical generators using solar cells; solar power generators; drives and linear guide units for motor-driven tracking of photovoltaic components and installations towards sun position, except for land vehicles; hangers as parts of machines.ACTIVE—
009Scientific, surveying, optical, weighing, measuring, signalling, checking (supervision) instruments as well as life-saving apparatus and equipment; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; data processing equipment; computer, computer software, photovoltaic devices for generating electricity, in particular photovoltaic modules and installations made therefrom; lightning conductors; voltage surge protectors; computer programs for the planning and project management of photovoltaic installations as well as for calculating their energy yields; photovoltaic solar modules; photovoltaic devices and installations for generating solar electricity, solar battery chargers; solar energy collectors for electricity generation; [electric] solar cells; solar panels; solar panels for generating electricity; portable solar panels for generating electricity.ACTIVE—
037Building construction; steel construction and light metal construction work; building of exhibition stands and stage sets; building, installation and maintenance of photovoltaic installations, including establishing work; building, installation and maintenance of photovoltaic cells and modules; assembling [installation] of machine plant; assembling [installation] of building framework; building construction supervision; varnishing.ACTIVE—
042Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software; software creation; software development; software engineering; architectural and engineer services; conducting technical project studies; construction drafting; civil engineering frameworks planning services; engineering consultancy and planning services in the field of renewable energy, in particular photovoltaic and biogas installations, including calculation of energy sources; conducting engineering surveys.ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 12, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 12, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 1, 2026NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 18, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Oct 2, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Oct 2, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 12, 2025MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Mar 12, 2025ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Aug 25, 2024RFNTREFUSAL PROCESSED BY IB—
Aug 5, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 5, 2024RFRRREFUSAL PROCESSED BY MPU—
Jul 14, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 13, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 10, 2024DOCKASSIGNED TO EXAMINER—
May 14, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
May 14, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 2, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance