Drawing for SUNRIDE

USPTO serial 79394940

SUNRIDE

Reviewed by CopyMark Law Group

Reg. 8006952Status 700Registered
Filing date
Status date
Registration date
Nov 4, 2025
Examiner
NEAL, KELLY L
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with SUNRIDE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Christopher M. Turk

Christopher M. Turk The Belles Group, P.C.1800 John F Kennedy Blvd.SuitePhiladelphia, PA 19103

Goods and services

ClassDescriptionStatusFirst use
006Common metals and their alloys; building and assembly materials of metal, namely, frameworks of metal for building in the nature of framework for photovoltaic installations; sheet metal; threaded metal rods; metal pipes; metal profiles made of iron, steel, nickel, titanium and other metals and their alloys, in particular extruded profiles of light metal; metal mounts in the nature of metal structures for mounting solar panels, mechanical fastening elements of metal, and structural joint connectors of metal for use in construction of photovoltaic installations; transportable buildings of metal; metal roofing, metal shelter structures, and portable stages composed of primary metal materials; roofings of metal, incorporating solar cells; frameworks of metal for building and construction purposes; frameworks of metal for building in the nature of framework for photovoltaic installations; small items of metal hardware and goods of metal for construction and building purposes, namely, springs, washers, nuts, pulleys, double-ended swivels, metal screws, metal tacks, metal nails, solar power mounts; metal roof ladders, roof step ladders made of metal, and hooks of metal for roofing slates; posts and ceiling supports of metal; metal containers for storage or transport, transport pallets of metal and crates of metal in the nature of metal storage boxes for general use; ironmongery in the nature of small items of metal hardware, namely, springs, washers, nuts, pulleys, double-ended swivels, metal screws, metal tacks, metal nails, solar power mounts; fittings of metal for building for use in construction in the nature of metal hardware, namely, springs, washers, nuts, pulleys, double-ended swivels, metal screws, metal tacks, metal nails, solar panel mountsACTIVE—
007Motors, other than for land vehicles; machine coupling and transmission components, except for land vehicles; electric generators; electric power generators using solar-power from solar cells; solar-powered electricity generators; drives for motors and linear guide units in the nature of linear motors as part of machines and motors for motor-driven tracking of photovoltaic components and installations towards sun position, except for land vehiclesACTIVE—
009Scientific instruments for measuring solar current, solar orientation and solar radiation; Signalling instruments in the nature of signalling lights, signalling whistles and signalling buoys; Apparatus for checking and monitoring solar production in the nature of electronic sensors for measuring solar radiation; Distance measuring, surveying, optical inspection and weighing apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating and controlling electricity in the nature of electrical controlling devices; data processing equipment; photovoltaic modules for production of electricity comprised of desktop computers and laptops, downloadable computer software for tracking and managing energy production; lightning conductors; voltage surge protectors; downloadable computer programs for the planning and project management of photovoltaic installations and for calculating energy yields of photovoltaic installations; photovoltaic solar modules; photovoltaic devices and installations in the nature of modules and solar panels for the production of electricity; solar-powered battery chargers; solar energy collectors for electricity generation in the nature of photovoltaic systems that convert sunlight into electric energy; solar cells; solar panels for the production of electricity; photovoltaic solar panels for the production of electricity; portable solar panels for the production of electricityACTIVE—
037Building construction; steel structure construction works; construction of exhibition stands and stage sets; installation and maintenance of photovoltaic installations; installation and maintenance of photovoltaic cells and modules; installation and maintenance of solar energy based power plants; building construction supervision; varnishingACTIVE—
042Scientific and technological services, namely, research and design in the field of photovoltaic solar energy; industrial analysis services and research in the field of solar photovoltaic systems; design and development of computer hardware and software; creating, maintaining and modernizing computer software; design and development of computer software; software engineering services; architectural and engineer services; technical research in the field of photovoltaic solar energy; construction drafting; civil engineering; providing planning and civil engineering services in the field of production of solar energy; engineering services and consultation for photovoltaic and biogas installations in the field of renewable energy; conducting engineering surveysACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 28, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 12, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
May 12, 2026FIMPFINAL DISPOSITION PROCESSED—
Feb 4, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 1, 2026NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 4, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Nov 4, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 18, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Oct 2, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Oct 2, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Sep 16, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 16, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 10, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 15, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 6, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 6, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 6, 2025ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Mar 11, 2025GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Mar 11, 2025GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 11, 2025CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 16, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 16, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 16, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 25, 2024RFNTREFUSAL PROCESSED BY IB—
Aug 5, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 5, 2024RFRRREFUSAL PROCESSED BY MPU—
Jul 13, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 12, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 10, 2024DOCKASSIGNED TO EXAMINER—
May 9, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
May 9, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 2, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance