Drawing for IGNO NON-COMBUSTIBLE INNOVATION

USPTO serial 79396363

IGNO NON-COMBUSTIBLE INNOVATION

Reviewed by CopyMark Law Group

Reg. 8097646Status 700Registered
Filing date
Status date
Registration date
Jan 13, 2026
Examiner
TOMLINSON, SABRINA R
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with IGNO NON-COMBUSTIBLE INNOVATION?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Dana Dickson

408 John Carlyle StAlexandria, VA 22314United States

Goods and services

ClassDescriptionStatusFirst use
006Building and construction materials and elements of metal, namely, decking boards, rails, joists, supports in the nature of pedestals, supports, brackets, clips, supports in the nature of joist hangers, supports in the nature of joist cleats, supports in the nature of support cleats, closures, termination profiles, spacer brackets and furniture anchors, all of the foregoing for building and construction of balconies and terraces; metal building materials for use in the construction and assembly of flooring and decking for balconies and terraces, namely, decking boards, rails, joists, supports in the nature of pedestals, supports, brackets, clips, supports in the nature of joist hangers, supports in the nature of joist cleats, supports in the nature of support cleats, closures, termination profiles, spacer brackets and furniture anchor; metal decking; metal connectors for decking and decking joists; metal brackets for use in the construction and assembly of decking; metal paving blocks for use in flooring construction; metal pedestal structures for use in construction in the nature of metal paving blocks; construction elements made of metal in the nature of supports being metal structural support pedestals for the construction of flooring; construction elements made of metal in the nature of supports being metal flooring support structures; metal decking support structures in the nature of metal joists and metal brackets for use in the construction and assembly of decking; Construction elements made of metal, namely, supports in the nature of metal paving support structures for use in the construction of flooring and decking for terraces and balconies; metal fireproof deckingACTIVE—
019non-metallic decking; non-metallic decking support structures in the nature of non-metal rails, joists, pedestals and structural supports for use in supporting decking and flooring on balconies and terraces; non-metallic pedestal structures in the nature of joist support pedestals, decking pedestals and paving pedestals for use in the construction and assembly of flooring and decking for balconies and terraces; construction elements not made of metal in the nature of supports, namely, non-metallic pedestal structures for use in construction; construction elements not made of metal in the nature of supports, namely, non-metallic structural support pedestals for the construction of flooring; construction materials, namely, non-metallic flooring materials; construction elements not made of metal in the nature of supports being non-metal flooring support structures; construction elements not made of metal in the nature of supports being non-metal decking support structures; construction elements not made of metal in the nature of supports being non-metal paving support structures; paving slabs not of metal; luminous paving blocks not of metal; paving blocks not of metal; paving stone; paving stones; asphalt paving compositions; paving tiles; concrete paving stones and tiles; non-metal fireproof paving in the nature of tiles, stones and blocks; non-metal fireproof decking; all of the aforementioned goods not in the field of wood-based materials and/or wood-related productsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 6, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 17, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 17, 2026FIMPFINAL DISPOSITION PROCESSED—
Apr 13, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 13, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 13, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 25, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 25, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 19, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 15, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Oct 29, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Oct 29, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Oct 24, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 24, 2025XAECEXAMINER'S AMENDMENT ENTERED—
Oct 24, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Oct 24, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
Oct 24, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
Oct 22, 2025ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Sep 4, 2025LIMELIMITATION FROM THE IB - REQUEST EXAM REVIEW—
Jun 24, 2025PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
May 29, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 29, 2025XAECEXAMINER'S AMENDMENT ENTERED—
May 29, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 29, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
May 29, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
Dec 13, 2024LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Dec 9, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 9, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 9, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 30, 2024RFNTREFUSAL PROCESSED BY IB—
Sep 5, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 5, 2024RFRRREFUSAL PROCESSED BY MPU—
Sep 5, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 4, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 26, 2024DOCKASSIGNED TO EXAMINER—
May 31, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
May 31, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 30, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance