Drawing for PRISMO

USPTO serial 79396550

PRISMO

Reviewed by CopyMark Law Group

Reg. 8105532Status 700Registered
Filing date
Status date
Registration date
Jan 20, 2026
Examiner
ANGOTTI, SALVATORE JOHN
Law office
Historical data usage

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with PRISMO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Charles T. J. Weigell

Charles T. J. Weigell Fross Zelnick Lehrman & Zissu, P.C.151 W. 42nd Street, 17th FloorNew York, NY 10036United States

Goods and services

ClassDescriptionStatusFirst use
012Railway rolling stock, namely, passenger carriages for automated guideway transit namely automated people mover system; railway rolling stock, namely, passenger carriages for automated guideway transit namely automated people mover system and structural parts therefor; automatic guided vehicles for automated guideway transit namely automated people mover system; automatic guided vehicles for automated guideway transit namely automated people mover system and structural parts therefor; driverless self-driving transport vehicles for automated guideway transit namely automated people mover system; driverless self-driving transport vehicles for automated guideway transit namely automated people mover system and structural parts therefor; vehicles for new urban transit system in the nature of automated guideway transit (AGT) namely automated people mover (APM) system and structural parts therefor; rubber tired vehicles for automated guideway transit (AGT) namely automated people mover (APM) system; rubber tired self-driving transport vehicles for automated guideway transit (AGT) system; driverless cars; electric railway cars; electric vehicles in the nature of electric railway cars; autonomous electric vehicles in the nature of driverless cars; automated fixed-guideway transit vehicles in the nature of automated people mover system (APM); fully-automated fixed-guideway transit vehicles; fully-automated driverless fixed-guideway transit vehicles; parts and accessories for fully-automated driverless fixed-guideway transit vehicles; vehicles for rubber-tired fixed-guideway system (AGT and APM); vehicles for rubber-tired driverless fixed-guideway system (AGT and APM); driverless vehicles in the nature of driverless cars; electric trains in the nature of electric railway carsACTIVE
037Installation, repair and maintenance of guide rail tracks for new urban transit system; repair and maintenance of automatic guided vehicles used as urban transit train vehicles of new urban transit system; repair and maintenance of automatic guided vehicles used for automated guideway transit (AGT) namely automated people mover (APM) system; repair and maintenance of computers used for controlling new urban transit system; repair and maintenance of computers for automated guideway transit (AGT) namely automated people mover (APM) system; installation, maintenance and repair of computer hardware for automated guideway transit (AGT) namely automated people mover (APM) system; providing information on repair and maintenance services of automatic guided vehicles used as urban transit train vehicles of new urban transit system; providing information on services of electricians with relation to electric power supplies for automated guideway transit (AGT) namely automated people mover (APM) system; services of electricians in the nature of installation of electrical equipment for automated guideway transit (AGT) namely automated people mover (APM) system; construction services in the nature of infrastructure construction services for automated guideway transit (AGT) namely automated people mover (APM) system; machinery installation in the nature of mechanical equipment installation, namely, installation of station platform screen doors, testing machines and instruments for vehicles for fixed-guideway transit system, remote control equipment and electrical controlling equipment and communication equipment for automated fixed-guideway transit system; installation, maintenance and repair of computer hardware; installation, maintenance and repair of railroad tracks; installation, maintenance and repair of running guideway rails for automated guideway transit system; installation, repair and maintenance of guideways for fixed-guideway transit system; repair and maintenance of vehicles for fixed-guideway transit system; repair and maintenance of vehicles for fully-automated driverless transit system (AGT and APM); repair and maintenance of operation systems for fixed-guideway transit vehicles; repair and maintenance of operation systems for automated driverless transit system (AGT and APM); installation, maintenance and repair of computer hardware for automated driverless transit system (AGT and APM); provision of information on repair and maintenance of automated vehicles for fixed-guideway transit system; operation, inspection, maintenance and their related information for electrical facilities for power supply to automated driverless transit system (AGT and APM); electrical works and operation, inspection and repair of electrical facilities; construction works in the nature of guideway construction services for automated guideway transit system; mechanical installation works, namely, installation of traffic control apparatus; installation, maintenance and repair of railway tracks; installation, maintenance and repair of guideways for automated fixed-guideway transit vehiclesACTIVE
042Engineering services in the fields of traffic and transportation; electrical engineering; mechanical engineering; engineering; configuration, installation, fault diagnosis, repair, upgrading and maintenance of operating software for automated guideway transit (AGT) namely automated people mover (APM) system; configuration, installation, fault diagnosis, repair, upgrading and maintenance of computer software; monitoring of computer system by remote access to ensure proper functioning of automated guideway transit (AGT) namely automated people mover (APM) system; monitoring of computer system operation by remote access; technical advice relating to operation of computer systems for automated guideway transit (AGT) namely automated people mover (APM) system; technological advice relating to operation of computers and driverless self-driving transport vehicles for automated guideway transit namely automated people mover system; providing non-downloadable computer software, designed to the specifications of others, used for driverless self-driving transport vehicles and autonomous electric vehicles; providing non-downloadable computer software, designed to the specifications of others, on data networks for providing real-time traffic data; transportation engineering; civil engineering; configuration, installation, fault diagnosis, repair, upgrading and maintenance of operating software for automated driverless transit system (AGT and APM); remote monitoring of computer system to ensure proper functioning of automated driverless transit system (AGT and APM); remote monitoring of computer system; providing technological consultancy relating to introductory/explanatory of performances and operations on computer systems for automated driverless transit system (AGT and APM); providing technological consultancy relating to introductory/explanatory information of equipment for which special/professional knowledges, techniques and experiences are required to operate to the purpose; provision of online non-downloadable computer software for vehicles with automated operating function and/or automated operation assist function; provision of non-downloadable computer software for providing traffic informationACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 18, 2026NURCNOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED
Aug 13, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Jul 30, 2026COC.CORRECTION UNDER SECTION 7 - PROCESSED
Jul 27, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Jul 24, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB
Jul 24, 2026FIMPFINAL DISPOSITION PROCESSED
Apr 22, 2026ES7RTEAS SECTION 7 REQUEST RECEIVED
Apr 20, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Jan 20, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED
Jan 20, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 11, 2025GPNXNOTIFICATION PROCESSED BY IB
Dec 2, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Dec 2, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 26, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Nov 26, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Nov 25, 2025OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Nov 15, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Nov 3, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Oct 29, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Oct 29, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Sep 30, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Sep 30, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Sep 30, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 6, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 6, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 6, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 28, 2025ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN
Jul 22, 2025PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY
Jun 25, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jun 24, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jun 24, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jun 24, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 5, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 5, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 5, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 18, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jan 17, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jan 17, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 11, 2024RFNTREFUSAL PROCESSED BY IB
Jul 23, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jul 23, 2024RFRRREFUSAL PROCESSED BY MPU
Jun 27, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Jun 26, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 13, 2024DOCKASSIGNED TO EXAMINER
Jun 1, 2024MAFRAPPLICATION FILING RECEIPT MAILED
Jun 1, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
May 30, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance