Drawing for GOBY

USPTO serial 79396733

GOBY

Reviewed by CopyMark Law Group

Reg. 8090410Status 700Registered
Filing date
Status date
Registration date
Jan 6, 2026
Examiner
YOO, JEANE
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with GOBY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Julia Anne Matheson

Julia Anne Matheson Potomac Law Group, PLLC1717 Pennsylvania Avenue, NW, Suite 1025Washington, DC 20006United States

Goods and services

ClassDescriptionStatusFirst use
007Wave energy power plant; machines for use in power and electricity generation from wave, tidal and hydro energy; energy converters, namely, apparatus for converting wave-, tidal-, and hydro-based mechanical energy into electrical energy; apparatus for generating electricity by energy conversion, namely, apparatus for generating electricity by converting wave energy; power generators characterized by the use of wave and tidal energy.ACTIVE—
037Advisory services relating to the construction, installation and maintenance of power plants; construction of wave conversion facilities and wave power plants; maintenance of wave conversion facilities and wave power plants; repair of wave conversion facilities and wave power plants.ACTIVE—
042Technical services in connection with energy supply and production systems, namely, engineering and electrical engineering services; engineering services in the field of energy technology; design and development of software for management, regulation and monitoring of energy systems; Software as a service (SaaS) services featuring software for the remote management of wave energy power plants and wave energy power generators; software as a service (SaaS) services for managing the operation of autonomous power plants; Platform as a service (PaaS) featuring computer software platforms for managing autonomous power plants, and wave energy power plants; platform as a service (PaaS) featuring computer software platforms for use in the operational management of autonomous power plants; technological services and technical advice, namely, engineering advice in the field of design, operation and maintenance of power plants and energy production units; technological consulting, advisory and information services in the field of wave energy technology; engineering consultancy, engineering design and product development for others of power generation equipment, plants and systems to produce electricity from water flowsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 30, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 14, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 14, 2026FIMPFINAL DISPOSITION PROCESSED—
Apr 6, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 6, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 6, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 22, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Nov 18, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 18, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 12, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 5, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 5, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Oct 24, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 20, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 12, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 12, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 12, 2025ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
May 7, 2025GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
May 7, 2025GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 7, 2025CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 24, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 24, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 24, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 12, 2024RFNTREFUSAL PROCESSED BY IB—
Sep 25, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 24, 2024RFRRREFUSAL PROCESSED BY MPU—
Sep 21, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 20, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 16, 2024DOCKASSIGNED TO EXAMINER—
Jun 6, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 6, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 6, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance