Drawing for HAZEMAG

USPTO serial 79397330

HAZEMAG

Reviewed by CopyMark Law Group

Reg. 7789618Status 700Registered
Filing date
Status date
Registration date
May 13, 2025
Examiner
BROWN, TINA
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with HAZEMAG?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

John S. Zanghi

John S. Zanghi Lippes Mathias LLP1228 Euclid AvenueThe Halle Building, 5th FloorCleveland, OH 44115

Goods and services

ClassDescriptionStatusFirst use
007Crushing machines, namely, crushing machines for industrial purposes, waste crushing machines, refuse crushing machines; rock crushing machines; machines and machine tools for treatment of materials and for manufacturing, namely, milling machines and grinding machines for the treatment of ceramics and metal, metalworking machine tools, machine tools for removing waste material; construction machines, namely, concrete construction machines, robots for building construction; tunnelling machines, namely, tunnel boring machines; wear parts for crushers, namely, springs being parts of machines, shaft couplings as parts of machines; mills, namely, milling machines; liners for hammer mills being parts of milling machines; stone crushers, namely, stone crushing machines; crushers for hard materials, namely, crushing machines for hard materials for industrial purposes; impact crushers, namely, impact crushing machines for industrial purposes; roller crushers, namely, roller crushing machines for industrial purposes; hammer breakers, namely, power- operated jack hammers; jaw crushers, namely, jaw crushing machines for industrial purposes; size reduction machines for rocks, namely, rock drills, machine tools for crushing rock, crushing machines for industrial purposes; size reduction machines for hard materials, namely, rock drills, machine tools for crushing rock, crushing machines for industrial purposes; screens, in particular screening machines and installations for screening, separating and classifying mineral substances, natural rock, construction waste, construction waste and demolition waste for surface mining, civil engineering, building construction, tunnel construction and road construction, namely, gravel and dirt sorting and screening machines, machines for separating target materials from mixtures of materials, waste and trash separator machines; conveyor machines and systems, namely, conveyers being machines, machines for conveying solids, conveyor belts; belt conveyors; conveying chains, namely, chains for conveyors, chain conveyors; belts for conveyors; reciprocating feeders, namely, electronic feeders for animals, automated wrapper in-feed machine; roller conveyors; conveyors being machines; transferring machines, namely, conveyors being machines, machines for conveying solids; shredding machines and systems equipped with optical measuring devices, devices for automating the operation of shredding machines, devices for measuring and control purposes as well as for the control and operation of machines and systems for the handling and processing of all kinds of materials, especially organic and inorganic bulk materials, namely, shredding machines for industrial use, shredding systems consisting of shredding machines for industrial use; optical testing devices for industry and image analysis devices, namely, smart optical sensors for measuring, monitoring and controlling particle size distributions and shapes on conveyers and in crushing stations sold as a unit with crushing machinesACTIVE—
009Optical measurement apparatus, namely, optical sensors, optical scanners; devices for automating the operation of shredding machines, namely, industrial automation controls; devices for measuring and control purposes as well as for the control and operation of machines and systems for the handling and processing of all kinds of materials, especially organic and inorganic bulk materials, namely, resistance measuring instruments, lasers for measuring purposes, electric control panels; optical inspection apparatus for industrial use; image analyzers, namely, image scanners; downloadable and recorded computer programmes for image processing; apparatus for the processing of images; devices for recording, transmitting, reproducing and processing data, namely, data processing apparatus, apparatus for recording, transmission, processing and reproduction of dataACTIVE—
011Dehumidifiers, in particular stirred shaft dryers, rotary dryers, belt dryers, and fluidized bed dryers for chemical processing; gas scrubbers; locks for flowable material, namely, valves being plumbing fittings, manually-operated plumbing valves; industrial processing plants for the processing of mineral substances, natural rocks, construction waste, construction waste and demolition waste, namely, sewage treatment plants, industrial waste water purification plants, sewage disposal plantsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 23, 2026NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 23, 2026NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 25, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 9, 2025FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 9, 2025FIMPFINAL DISPOSITION PROCESSED—
Nov 30, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Nov 12, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 12, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Aug 13, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 13, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
May 13, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 25, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 25, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 19, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 27, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 27, 2025XAECEXAMINER'S AMENDMENT ENTERED—
Feb 27, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 27, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 27, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 26, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 26, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 26, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 30, 2024RFNTREFUSAL PROCESSED BY IB—
Sep 4, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 4, 2024RFRRREFUSAL PROCESSED BY MPU—
Sep 1, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 31, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 27, 2024DOCKASSIGNED TO EXAMINER—
Jun 18, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 18, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 13, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance