USPTO serial 79397796
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
John Alumit
John Alumit ALUMIT IP135 S. Jackson Street, Suite 200Glendale, CA 91205United States| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Tubes of metal; junctions of metal for pipes; rectangular tubes of steel; square tubes of steel; pipe extensions of metal; pipe unions of metal; metal structures in the nature of frame parts and bogie frames for rail vehicle and offshore constructions, jack-up rigs, and offshore platforms; portable stands of metal for use by spectators, namely, bleachers; metal profiles, namely, semi-finished profile sections of steel or iron; mouldings of metal for building; door sections of metal in the nature of door fittings; metal materials for building and construction, namely, seamless hollow sections made of carbon steel; frames of metal for building; structures of metal, namely, metal shelter structures; buildings, transportable, of metal; pre-fabricated buildings being fixed structures of metal; metal structures in the nature of loading ramps for use with vehicles; hollow steel bars; joists of iron or steel; transportable metal framed buildings; building and construction materials and elements of metal, namely, seamless hollow sections made of carbon steel for building, hall and roof construction, sport stadiums, rollercoaster and airport construction, bridge building, structural facing; roof components of metal, namely, tiles and panels; space frames of metal for building; facade elements of metal, namely, panels for construction purposes; mouldings of metal for building cornices; metal brackets for building; shaped metal sections in the nature of metal tubes; metal railings; framework of metal for building; frameworks of metal; shaped metal portions in the nature of metal tubes; structures of metal, namely, shelters; metal materials for railway construction; ceiling supports of metal, stanchion stays of metal; building beams of metal; metal goods for use in construction, namely, seamless hollow sections made of carbon steel; pillars of metal for buildings; pillars of metal for building; steel beams; steel frames for building; structural joint connectors of meta, namely, steels; bracings of metal for load handling; beams of metal; frameworks of metal for ceilings; metal partitions for building; lintels of metal; scaffolding of metal; scaffolding towers of metal; safety scaffolding of metal; the aforementioned goods never for ventilation systems and air conditioning apparatus | ACTIVE | — |
| 007 | Barrels for use as a component part of drilling rigs; hangers being parts of machines; pipes being fitted parts of machines; tubes being fitted parts of machines; the aforementioned goods never for ventilation systems and air conditioning apparatus | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 25, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 9, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 9, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Dec 5, 2025 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Nov 19, 2025 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Nov 19, 2025 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Aug 13, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 26, 2025 | LIMN | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| May 13, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| May 13, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 25, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 25, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 19, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Mar 4, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 17, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 17, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 17, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 15, 2024 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Sep 15, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 29, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 29, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 29, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 28, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 26, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 7, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 28, 2024 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 28, 2024 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 20, 2024 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |