USPTO serial 79398695
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Nicholas D. Wells
Nicholas D. Wells Legends Law Group, PLLC330 Main St.Kaysville, UT 84037United States| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Scientific apparatus, instruments and installations for chemical reactions, precipitation reactions, synthesis and crystallization and for biomass reactions of cells, bacteria, yeasts, namely, bioreactors, pressure autoclaves, chemical reactors, all the aforesaid items for laboratory use; non-medical apparatus for analysis, namely, liquid analyzers; chromatography apparatus for laboratory use; distilling units for scientific purposes; stills, glass flasks, glassware with antistatic coating for laboratory use; gas meters for recording gas consumption in a chemical reaction; scientific apparatus and instruments for measuring, indicating and controlling, namely, measuring glassware; filtration apparatus and systems for laboratory experiments, namely, laboratory filters; downloadable software for controlling laboratory research equipment in the field of chemistry, chemical engineering, and pharmaceutical industries, and for analyzing chemical and pharmacological data derived from laboratory instruments, for scientific laboratory use; all the aforesaid items being of Swiss origin | ACTIVE | — |
| 011 | Scientific apparatus, instruments and installations for heating and cooling in the nature of thermal transfer, namely, hot plates, butane torches, bunsen burners, electric heating fans, electric cooling fans, steam generators, refrigerators, and electric spray dryers; apparatus, instruments and installations for evaporation, condensation, boiling with reflux and for simple distillation and for azeotropic distillation with elimination of a phase, namely, evaporators; distillation apparatus for industrial purposes with mechanical, pneumatic or electrical stirrer control; stirred autoclaves for laboratories; chromatography apparatus for industrial use; distillation columns not for scientific purposes; stills not for scientific purposes; filter and drying apparatus, namely, water filters, industrial dryers for heating; all the aforesaid items being of Swiss origin | ACTIVE | — |
| 042 | Development, implementation, adaptation in the nature of upgrading, and maintenance of software for laboratory and industrial purposes, namely, for inputting, displaying and evaluating measurement results as well as for regulation of apparatus; engineer technical planning, namely, engineering of chemical and pharmaceutical laboratories and biological, pharmaceutical, and chemical research facilities; research in the fields of chemistry and biology; technical project planning, namely, planning of buildings and infrastructure systems for buildings | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 16, 2026 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Mar 30, 2026 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 29, 2026 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jul 26, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jul 10, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jul 10, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Apr 8, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 10, 2025 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Jan 7, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jan 7, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 19, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 19, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 13, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 1, 2024 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Oct 8, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 23, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 23, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 23, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 25, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 31, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 31, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 9, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 8, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 4, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 3, 2024 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 3, 2024 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 27, 2024 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |