USPTO serial 79399721
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Joseph V. Norvell
Joseph V. Norvell Norvell IP llcPO Box 2461Chicago, IL 60690United States| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Transportable buildings of metal; framework for building of metal; cladding of metal for construction and building; facade panels of metal for construction purposes; facades cladding of metal for building; wall claddings of metal for building; metal profiles being metal reinforcement materials for building; metal profiles being metal reinforcement materials for building for thermal insulation purposes; building panels of metal; metal frameworks for building construction incorporating photovoltaic elements; fasteners of metal for solar modules; metal construction materials presenting sound and heat insulation qualities, namely, building panels of metal incorporating thermal and acoustic insulation; prefabricated metal partitions for building incorporating mineral wool insulation | ACTIVE | — |
| 007 | Concrete construction machines; machines for applying metal coatings for the construction and renovation of building facades; machines for applying non-metal coatings for the construction and renovation of building facades; compressors for air conditioning apparatus; ventilation pumps being pumps for machines; high-pressure pumps for heating installations; heat recovery devices, namely, heat exchangers being parts of machines; solar-powered electrical energy generators; electric generators using solar cells; turbines, other than for land vehicles, for energy production; jointing machines for woodworking | ACTIVE | — |
| 019 | Transportable buildings not of metal; non-metallic prefabricated building elements; building glass; tempered glass for building; transparent glass for building; tinted glass for building; fire-resistant glass for building; insulated glass for building purposes; safety glass for building; laminated glass for building; vitreous non-metal claddings for walls and partitions, and roof coverings for building; asphalt, pitch and bitumen; facade panels not of metal for construction purposes; non-metallic window frames for building; wall claddings, not of metal, for building; non-metallic partitions for building; non-metallic building profiles being reinforcing materials not of metal for building thermal insulation purposes; building panels not of metal; non-metal building products for building facades, namely, siding; non-metallic building materials and elements incorporating solar panels, namely, siding and roofing; splashbacks being wall panels not of metal; Thermal insulation glass for use in construction; construction materials, not of metal, with sound insulation qualities, namely building panels incorporating acoustic insulation; wood boards; cladding of wood for building; wooden shutters; glue-laminated wood; tiles of wood; transportable buildings of wood; wooden acoustic screens being non-metal partitions for buildings; wood building panels; fiberboard; door frames of wood; acoustic wooden panels for walls and ceilings, namely, non-metal building panels incorporating acoustic insulation; waterproof roof building panels of wood and resins | ACTIVE | — |
| 037 | Construction and demolition of buildings; reinforcement of buildings; repair and maintenance of buildings; building construction supervision; construction consultancy; providing information with respect to construction; installation of panels relating to building; restoration of building facades; glazing; installation and repair of plate glass; installation of glass building structures; construction, repair and maintenance of building facades; construction, repair and maintenance of glass building facades; construction, installation, maintenance and repair of photovoltaic installations and solar panels; maintenance and repair of heating installations; air-conditioner installation and repair; installation, repair and maintenance of air conditioning apparatus; installation of ventilation and dust extraction systems; installation of heating and cooling apparatus; modernization, being the repair, maintenance, and modification of heating installations in buildings; modernization, being the repair, maintenance, and modification of ventilation installations in buildings; retrofitting, being the repair, maintenance, and modification of air-conditioning installations in buildings; air-conditioning apparatus installation and repair; retrofitting, being the repair, maintenance, and modification of heating, ventilating and air-conditioning installations in buildings; consultancy services relating to installation of heating and cooling apparatus; installation of solar energy systems; installation of solar heating system; installing sun protection systems; repairing sun protection systems; construction of public solar power installations; servicing and repair of solar energy installations; servicing and repair of solar heating installations; installation of residential solar panel energy systems; installing non-residential solar panel energy systems; installation of insulating materials in buildings, roofs, ceilings, and internal and external walls; installation of thermal insulation for windows; installation of thermal insulation for buildings; repair and installation of insulation for window seals; installing electric energy production apparatus. | ACTIVE | — |
| 042 | Design of residential, commercial, and factory buildings; engineering; quality control for others; research and design in the field of building construction; technical project studies, namely, conducting of feasibility studies in the field of new technologies; construction drafting; behavioral analysis of the structure of construction materials, namely, materials testing and analysis in the field of construction materials; consultancy in the field of architecture and the development of construction plans; research relating to building construction; research and development in the field of energy saving; design, installation, updating, maintenance, rental of software in the field of construction; design and development of photovoltaic systems; all of the foregoing also provided in connection with the fields of energy installations, the environment, solar thermal energy, and solar photovoltaic energy; energy auditing; designing photovoltaic solar systems for building facades; design and development of software for controlling, adjusting and controlling solar energy systems; design and development of systems for regenerative energy production | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 1, 2026 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 25, 2025 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Dec 25, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 10, 2025 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 10, 2025 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Nov 22, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 22, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jul 30, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 29, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Apr 29, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 11, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 11, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 5, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 14, 2025 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 14, 2025 | ALIE | ASSIGNED TO LIE | — |
| Feb 12, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 12, 2025 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Feb 12, 2025 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Feb 12, 2025 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Feb 12, 2025 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jan 16, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 16, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 16, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 30, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 13, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 13, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Nov 7, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Nov 6, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 28, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 15, 2024 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 15, 2024 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 11, 2024 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |