Drawing for EASTMAN ENERGY. UNLIMITED.

USPTO serial 79399984

EASTMAN ENERGY. UNLIMITED.

Reviewed by CopyMark Law Group

Reg. 7830621Status 700Registered
Filing date
Status date
Registration date
Jun 17, 2025
Examiner
KOLODNER, LOUIS FRANCIS
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with EASTMAN ENERGY. UNLIMITED.?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Diana Portna

Diana Portna Brandspace.legal2435 Bedford St.12bStamford, CT 06905United States

Goods and services

ClassDescriptionStatusFirst use
011Evacuated heat pipe solar collectors being heat exchangers; Outdoor solar lights, namely, solar lighting fixtures, paver lights, and security lights; Parabolic mirrors designed for the collection of solar energy being parts of solar thermal collectors for heating purposes; Solar cell lighting apparatus for vehicles; Solar collectors for heating; Solar cookers being solar powered grills for cooking; Solar energy collectors for heating; Solar energy powered space heating apparatus; Solar energy powered heating installations; Solar furnaces; Solar heat collection panels; Solar heating apparatus being solar heating installations; Solar heating installations; Solar heating panels used for indoor heating purposes; Solar lamp units being lighting installations; Solar lamps; Solar lights, namely, solar powered accent lights, night lights, street lights, and garden lights; Solar panels for use in heating being solar heat collection panels; Solar powered grills for cooking; Solar powered air heating apparatus; Solar powered heating installations; Solar powered lamps; Solar powered torches for lighting; Solar powered ventilation apparatus, namely, solar-powered electric fans; Solar thermal collectors being solar collectors for heating; Solar thermal installations being heating installations; Solar thermal modules being solar thermal installations; Solar thermal receivers being heating installations; Solar water heaters; Solar-powered grills for cooking; Solar-powered heating and industrial boilers; Solar-powered floor heating apparatus; Solar-powered heating installations; Solar-powered lamps; Solar-powered lighting bollards being lighting installations; Solar-powered shed lights; Solar-powered steam generators; Solar-powered torches for lighting; Solar-powered ventilation apparatus, namely, solar-powered electric standing fans; Steam generating installations using solar energy; Structural supports specifically adapted for use with solar heating tubes being solar collectors for heating; Thermal storage apparatus for solar energy for heating, namely, solar collectors for heating; Thermal storage instruments for solar energy for heating, namely, solar collectors for heating; All of the foregoing in the industry of electric mobility and renewable energy generation and excluding plumbing related apparatus and fittingsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 5, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jan 17, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 17, 2026FIMPFINAL DISPOSITION PROCESSED—
Jan 1, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Dec 17, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 17, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Sep 17, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 17, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jun 17, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 29, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 29, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 23, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 1, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 21, 2025XAECEXAMINER'S AMENDMENT ENTERED—
Mar 21, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 21, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 21, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 19, 2025DOCKASSIGNED TO EXAMINER—
Mar 16, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 16, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 16, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 30, 2024DOCKASSIGNED TO EXAMINER—
Nov 30, 2024DOCKASSIGNED TO EXAMINER—
Oct 8, 2024RFNTREFUSAL PROCESSED BY IB—
Sep 17, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 17, 2024RFRRREFUSAL PROCESSED BY MPU—
Sep 17, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 16, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 16, 2024RFWRNON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW—
Sep 13, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 12, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 9, 2024DOCKASSIGNED TO EXAMINER—
Jul 22, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 22, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 18, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance