Drawing for Serial No. 79400386

USPTO serial 79400386

Serial No. 79400386

Reviewed by CopyMark Law Group

Reg. 7781292Status 700Registered
Filing date
Status date
Registration date
May 6, 2025
Examiner
VOHRA, SANJEEV KUMAR
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with Serial No. 79400386?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jill J. Chalmers

Jill J. Chalmers Taft Stettinius & Hollister LLP90 South Cascade Avenue, Suite 1500Colorado Springs, CO 80903United States

Goods and services

ClassDescriptionStatusFirst use
007Automated manufacturing equipment, namely, manufacturing machines used to fabricate mass-customized building components or assemblies.ACTIVE—
009Downloadable computer software for use in designing, engineering, prefabricating and constructing entire buildings; end-to-end downloadable parametric software, namely downloadable proprietary computer software used to design housing projects, collect and gather manufacturing instructions and construct buildings; downloadable algorithmic performance optimization computer software for use in providing iteratively optimized building solutions through internal, adaptive and automated processes for the economical, ecological, social performance, and urban livability; downloadable computer software for use in providing building systems enabling design adaptation and customization to a variety of aesthetics and uses while sharing the same underlying technologies and systems across multiple projects; downloadable integration computer software for use in ensuring vertical integration and calibration of goods and services of housing project; downloadable computer software for use in designing buildings based on mass timber to create automated prefabrication of a housing project; electronic building automation installations for remote control of connected devices, namely, downloadable software installed in buildings, for integrating mechanical, electrical and plumbing (MEP) automation technology; downloadable computer software used for parametric urban designACTIVE—
019Non-metal fire-resistant boards and panels for construction; pre-fabricated mixed-use buildings of wood; pre-fabricated single-use buildings of wood; prefabricated houses of wood; mobile homes being manufactured housing of wood; pre-fabricated buildings of wood; building materials, namely, composite panels composed primarily of nonmetal materials for faster and more efficient on-site construction of multi-story buildingsACTIVE—
035Business consultation on the design, engineering, manufacturing and installation of integrated and off-site prefabricated building systems.ACTIVE—
037Building construction services, namely, construction of mixed-use buildings, retail stores, restaurants and business offices; construction of buildings with high energy performance; construction of mixed-use buildings; construction of single-use buildings, housing services, namely, development of real property, urban housing and urban infill housing; installation of pre-fabricated building assemblies or building parts made of timber, to expedite on-site constructionACTIVE—
040Custom manufacturing of building components; building systems technology, namely, custom manufacture of pre-fabricated building assemblies or building parts made of timber, to expedite on-site construction.ACTIVE—
042Platform-based building solutions for residential and commercial buildings, namely, providing temporary use of online non-downloadable computer software for use in the process of designing, engineering, manufacturing and assembling integrated and off-site prefabricated buildings; providing temporary use of online non-downloadable computer software for use to design, engineer, prefabricate and construct entire buildings; providing building design services for the manufacturing of buildings with life cycle performance close to or equal to carbon neutralityACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 16, 2026TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jun 16, 2026ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 16, 2026REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 8, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Dec 25, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 24, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 24, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Dec 4, 2025FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 4, 2025FIMPFINAL DISPOSITION PROCESSED—
Aug 6, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 6, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
May 6, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 18, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 18, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 12, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 20, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 10, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 10, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 10, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 15, 2024RFNPREFUSAL PROCESSED BY IB—
Aug 27, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 27, 2024RFRRREFUSAL PROCESSED BY MPU—
Aug 22, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 21, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 17, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 16, 2024DOCKASSIGNED TO EXAMINER—
Aug 15, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 15, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 25, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance