Drawing for KMEW

USPTO serial 79401515

KMEW

Reviewed by CopyMark Law Group

Reg. 7971423Status 700Registered
Filing date
Status date
Registration date
Oct 7, 2025
Examiner
ALBANO, ASHLEY C
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with KMEW?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael T. Smith

Michael T. Smith Birch Stewart Kolasch & Birch, LLP2600 Park Tower Drive, Suite 600Vienna, VA 22180United States

Goods and services

ClassDescriptionStatusFirst use
002PaintsACTIVE—
006Wall plaques made of common metal; exterior wall materials, namely, sidings of metal or preformed corners of metal; roofing of metal; wall linings of metal for building; wall claddings of metal for building; wall panels of metal; roof covering of metal; roofing tiles of metal; shingles of metal; wainscotting of metal; steel plates for cladding material; metal cladding for construction and building; metal gutters; metal louvers for guiding light; metal louvers for façade; metal eaves; nails of metal; screws of metal; metal materials for building or construction, namely, chimney shafts, stair treads, fasteners for casement windows, gratings, fences, shutters, tiles, steel frames for building, shelf boards, hinges, handrails, gabions of steel wire, ceiling boards, ceiling decorations, door knockers, gutter brackets, sliding door pulleys or rollers, doors, door handles, door closers, pillars, beams, grilles for building, wire fences, fire retarding doors, floor pavings, windows, window knobs, window frames, window pulleys, gates, floor boards, louver doors, rock slide retention wire nets, laths, roof materials being roof flashing, metal roofing coils, roof snow guards, roof clips, solar panel mounting brackets, weathercocks, ridges for ventilation, throating plates; metal hardware, namely, cut nails, wedges and pegs, washers, nuts, screws, tacks, plugs, bolts, rivets, washers, rings, chains, casters, horseshoe nails, metal fixtures for ropes for uses with swimming poolsACTIVE—
007Cemented carbide cutting tools; cemented carbide tips; diamond-pointed metal-cutting tools; wear-resistant diamond-pointed metal-cutting tools; power circular saw blades for metal working; power circular saw blades for metal cutting; power circular saw blades for processing cement building materials; power circular saw blades for processing cement building or construction materials; power circular saw blades for cutting cement building materials; power circular saw blades for cutting cement building or construction materials; metalworking machines and toolsACTIVE—
008Hand operated cutters for cutting building or construction materials of cement; bladed or pointed hand tools for repairing roof materials and swords; bladed or pointed hand tools for cutting nails and swords; hand-operated sealing guns and their parts and fittings; hand-operated tools for the extrusion of sealants and their parts and fittingsACTIVE—
017Silicone sealants for building; synthetic resin sealants for building and construction; rubber sealants for building and construction; sealants for building; sealants for building, namely, sealing gaskets for use as a fluid tight seal for building; adhesive tape for buildingACTIVE—
019Sand for building or construction; sand; non-metal building products, namely, siding materials, not of metal; roofing slates; cement slates; roofing veneer slate; fiber reinforced cement slates; cement mortar slates; cement roofing tiles; fiber reinforced cement roofing tiles; calcium silicate boards for building and construction; non-metal building products, namely, siding materials of cement; siding, not of metal; siding of cement; cement wall linings for building; roof coverings not of metal; non-metallic roof tiles; roofs and roof structures, not of metal; non-metal roof materials and roof elements, namely, non-metal roofing panels; roofing elements of fiber reinforced cement, namely, roof flashing of fiber reinforced cement; panels and boards made of fiber-reinforced cement; fiber cement siding; fiber cement; cement based wall coatings; cement wall components being preformed corners; calcium silicate boards; fiber reinforced cement boards; cement boards; fiber cement boards; roofing of cement; roofing cement; cement exterior wall materials being cladding; cement wall claddings for building; roofing, not of metal; non-metal shingles; wainscoting, not of metal; rain gutters of synthetic resin; waterproof building paper; waterproof membranes for roofing, floors, or walls; waterproof building paper of synthetic resin; waterproofing membranes of synthetic resin for roofing, floors or walls; synthetic non-metal building materials, namely, synthetic boards; synthetic non-metal building materials, namely, synthetic roofing shingles, flooring materials or wall-claddings, and rocks for creating landscape and waterscape settings; cement and its products, namely, almina cement, Portland blast-furnace slag cement, silica cement, slag-lime cement, portland cement, cement boards in the nature of cement bonded particle board, wood-fiber reinforced cement boards, pulp-fiber reinforced cement boards, fiber cement boards in the nature of cement bonded particle board, wood-fiber reinforced cement boards, pulp-fiber reinforced cement boards, and cement slabs, all used for cement exterior sidings and cladding; rubber building or construction materials, namely, rubber flooring, cove bases, and rubberized asphalt primerACTIVE—
037Building construction; construction consultancy; construction, namely, custom construction of residential and commercial communities; construction consultancy of residential and commercial communitiesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 30, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 12, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 12, 2026FIMPFINAL DISPOSITION PROCESSED—
Jan 22, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jan 7, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 7, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 7, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Oct 7, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Oct 7, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 3, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 19, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 19, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 13, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 10, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 27, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 27, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 27, 2025ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
May 7, 2025GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
May 7, 2025GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 7, 2025CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 19, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 19, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 19, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Mar 13, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 12, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 12, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 12, 2024RFNTREFUSAL PROCESSED BY IB—
Sep 25, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 24, 2024RFRRREFUSAL PROCESSED BY MPU—
Sep 21, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 20, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 16, 2024DOCKASSIGNED TO EXAMINER—
Aug 15, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 15, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 15, 2024LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Aug 8, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance