Drawing for Serial No. 79401524

USPTO serial 79401524

Serial No. 79401524

Reviewed by CopyMark Law Group

Reg. 8362418Status 700Registered
Filing date
Status date
Registration date
Jul 28, 2026
Examiner
LAM, HAI-LY HUYNH
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with Serial No. 79401524?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

JOHN W. MCGLYNN

JOHN W. MCGLYNN BUCHANAN INGERSOLL & ROONEY, P.C.500 Delaware AveSuite 720Wilmington, DE 19801

Goods and services

ClassDescriptionStatusFirst use
001Chemicals and chemical preparations for use in construction, namely, for hardening concrete, cement, and asphalt, and for stabilizing soil and sand; chemical additives for manufacturing and hardening concrete, cement, and asphalt, and for stabilizing soil and sand; chemical additives for cement, concrete and cementitious construction materials; chemical additives for manufacturing and hardening concrete, cement, and asphalt; chemical additives for stabilizing soil and sandACTIVE—
009Downloadable and recorded Computer software for management, monitoring and control of facilities and machines all for the mining, manufacture and use of cement, cement aggregates, ready-mixed concrete, and asphalt; downloadable and recorded application software for management, monitoring and control of facilities and machines all for the mining, manufacture and use of cement, cement aggregates, ready-mixed concrete, and asphalt; downloadable and recorded artificial intelligence and machine learning software for management, monitoring and control of facilities and machines all for the mining, manufacture and use of cement, cement aggregates, ready-mixed concrete, and asphalt; downloadable and recorded industrial process control software; downloadable and recorded computer operating system software and downloadable and recorded computer operating system support software and firmware; downloadable and recorded virtual and augmented reality software for management, monitoring and control of facilities and machines all for the mining, manufacture and use of cement, cement aggregates, ready-mixed concrete, and asphalt; downloadable web applications for management, monitoring and control of facilities and machines all for the mining, manufacture and use of cement, cement aggregates, ready-mixed concrete, and asphalt; downloadable and recorded computer server operating softwareACTIVE—
019Building and construction materials and elements, not of metal, namely, concrete pipes, concrete boxes, concrete vaults, pre-cast concrete wall forms, and non-metal catch basins for attachment to sewer pipes to trap debris; concrete; cement; aggregate materials for use in concrete, namely, sand, gravel, stone chips, crushed stone, and stones; cement aggregates; asphaltACTIVE—
035Retail store services featuring building and construction materials; Wholesale store services featuring building and construction materials; Business advisory services relating to building and construction materialsACTIVE—
037Building construction services; Repair and maintenance of buildings; Repair and maintenance of roads; Property development services, namely, development of real property, in particular, repair, improvement, and new constructionACTIVE—
039Transport and delivery of building and construction materials; Storage services, namely, storage of goods; Waste collection, namely, collection of domestic and industrial waste and trash; Removal of waste, namely, transport and storage of wasteACTIVE—
040Recycling of waste and trash; treatment of waste; destruction of waste and trash; incineration of waste and trashACTIVE—
042Chemical laboratories; chemistry services, namely, research in the field of chemistry and chemistry consultation; engineering services, namely, engineering for the construction industry; information technology consulting services relating to the development, programming and implementation of software; software as a service (SaaS) in the nature of hosting cloud-based software for others; rental of software for data processing; data conversion of electronic informationACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 28, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jul 28, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 9, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 9, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 3, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 14, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 13, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 13, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 13, 2026ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Mar 26, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jan 7, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 7, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Nov 13, 2025GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Nov 13, 2025GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 13, 2025CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 14, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 14, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 14, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 14, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 14, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 14, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 17, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 17, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 17, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 22, 2024DCPNCHANGE OF OWNER RECEIVED FROM IB—
Oct 19, 2024RFNTREFUSAL PROCESSED BY IB—
Sep 16, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 16, 2024RFRRREFUSAL PROCESSED BY MPU—
Sep 13, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 12, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 11, 2024DOCKASSIGNED TO EXAMINER—
Aug 15, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 15, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 8, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance