Drawing for DEHNSHORT

USPTO serial 79402044

DEHNSHORT

Reviewed by CopyMark Law Group

Reg. 7895265Status 700Registered
Filing date
Status date
Registration date
Aug 19, 2025
Examiner
LEE, YATSYE ISADORA
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with DEHNSHORT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Brian P. Gregg

Brian P. Gregg McNees Wallace & Nurick100 Pine StreetHarrisburg, PA 17108United States

Goods and services

ClassDescriptionStatusFirst use
009Measuring, detecting, monitoring and controlling devices for measuring, testing, analyzing and monitoring electrical voltage, temporary overvoltages and load response and power; sensors, detectors and monitoring instruments for sensing, detecting and monitoring electrical voltage, temporary overvoltages, load response and power, impulse current, long stroke, rise time, specific energy, charge, temperature; point sensors; optical fibre sensors; arc fault protection systems consisting of sensors and devices for detecting, recording and detecting arc faults as well as switching devices for the controlled switching off or extinguishing of arc faults; switches, electric; switchgear and switching devices for all voltages and all amperages; electrical and electronic devices for detecting, quenching and preventing the damaging effects of arc faults in electrical installations and distribution boards.ACTIVE—
037Installation of electrical systems; installation of surge protection, lightning protection, arc fault protection and earthing installations; repair and maintenance of electrotechnical equipment and installations; advice on installation of electrical systems; advice on the installation of surge protection, lightning protection, arc fault protection and earthing installations; advice on the repair and maintenance of electrical devices and systems.ACTIVE—
042Engineering consultancy services on lightning protection, voltage surge protection and arc fault protection; research and development for others with regard to new products in the areas of lightning protection, surge protection and arc fault protection; preparation of technical expert opinions relating to engineering advice on lightning protection, voltage surge protection and arc fault protection, technical research in the field of designing electrical components relating to lightning defense equipment, lightning defense components and lightning arrestors, namely, lightning defense equipment, lightning defense components and lightning arrestors to protect against damage caused by power surges and lightning; industrial design services; material testing; quality control for others; Electrical safety research, namely, evaluating and analysing surge protection, lightning protection, arc fault protection and earthing systems with regard to hazards; technical testing services provided by a high-voltage testing laboratory and a test laboratory for testing lightning protection equipment, lightning protection components and voltage surge arresters by simulating lightning currents or lightning impulse currents; technological analysis services in the field of lightning protection, voltage surge protection and arc fault protection; preparation of technological reports namely, providing engineering information about arc fault energies, short circuit currents in distribution systems and arc fault hazards as well as about lightning protection, surge protection, earthing installations and occupational safety, industrial safety and plant safety; engineering design and consultancy; providing technology consulting and advice on arc fault protection; providing technology consulting with regard to the creation of technical safety concepts; testing, authentication and quality control of lightning protection, voltage surge protection; technology data analysis services.ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 19, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 3, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 3, 2026FIMPFINAL DISPOSITION PROCESSED—
Jan 22, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jan 7, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 7, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Nov 19, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 19, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 19, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 3, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 3, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 28, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 2, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 7, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 7, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 7, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 26, 2024RFNTREFUSAL PROCESSED BY IB—
Oct 10, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 10, 2024RFRRREFUSAL PROCESSED BY MPU—
Oct 8, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Oct 7, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 3, 2024DOCKASSIGNED TO EXAMINER—
Aug 20, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 20, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 8, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance