Drawing for WIEXTRUDE

USPTO serial 79402884

WIEXTRUDE

Reviewed by CopyMark Law Group

Reg. 7895292Status 700Registered
Filing date
Status date
Registration date
Aug 19, 2025
Examiner
DWYER, JOHN D
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with WIEXTRUDE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Steven D Lustig

Steven D Lustig Panitch Schwarze Belisario & Nadel LLPTwo Commerce Square, 2001 Market StreetSuite 2800Philadelphia, PA 19103

Goods and services

ClassDescriptionStatusFirst use
006Building components of metal, namely, panels; metallic building components, namely, panels; metal materials for construction, namely, panels; building panels of metal, wall panels of metal, metal door panels, metal floor panels; façade construction components of metal; extrusions of metal for construction purposes; extrusions of aluminium for construction purposes; space frames of metal for building; prefabricated metal constructions, namely, transportable metal constructions, refractory construction materials of metal and metal cladding for construction and building; prefabricated houses of metal; casings of metal; crash barriers of metal; hand rails of metal; metal rails; metal door frames; frames of metal for doors; metal components for doors; door casings of metal; metal window frames; curved window frames of metal; railway materials of metalACTIVE—
007Extrusion machines for metal; metal extrusion presses; bending machines; valves as machine components; brake components for machines; machine couplings and transmission components except for land vehicles; vehicle parts, namely, engine cases; engine housings being engine mounts, other than for land vehicles; crankcases for motors, machines and land vehicle enginesACTIVE—
009Electric and electronic components for computers; batteries for electric vehicles; battery cases; battery boxes; battery housings; electric vehicle battery enclosures; replacement parts for the aforesaid goodsACTIVE—
012Land vehicles; replacement parts for water vehicles, replacement parts for land vehicles, replacement parts for air vehicles; replacement parts for sea vehicles; components for the outer bodies of vehicles, namely, vehicle bumpers, vehicle doors, and body panels for vehicles; machine couplings and transmission components for land vehicles; automobiles and structural parts therefor; structural parts for automobiles; shaped panels for vehicle bodies; bodywork parts for motor vehicles; side shields as structural parts of vehicles; hood shields as structural parts of vehicles; chassis for automobiles and structural parts therefor; load bearing sections for chassis frames of vehicles; modular chassis systems for vehicles; bumpers for vehicles; automobile chassis designed to deform and crumple in a collision; vehicle parts, namely, shock absorbers; airbags for vehicles; inflatable air bags for use in vehicles for the prevention of injury in accidents; brake components for vehicles; crankcases for land vehicle components, other than for engines; vehicle parts, namely, constant velocity joints; airplanes and structural parts therefor; structural parts for aircraft; bodies for aircraft; structural parts for trains; railway carriage body parts; bodies for railway cars; bogies for railway cars; chassis for railway cars; doors for railway cars; luggage racks for motor vehicles; luggage racks for trains; ships and structural parts therefor; structural parts for ships; bodies for ships; replacement parts for the aforesaid goodsACTIVE—
040Custom manufacture of prefabricated construction elements; custom manufacture of molded components; shaping of metal components; machining parts for others; custom assembling of automobile bodies and chassis for othersACTIVE—
042Product design and development; design of manufacturing methods; product development for vehicle construction and for vehicle body construction; design of vehicles and vehicle parts and components; design of mechanical components; design of land vehicle parts; design of parts for rail vehicles; design of extrusion parts for use in aeroplanes; design of tooling for the production of land vehicle parts; design of space-frame structures; design of parts and components for ships; consultancy services relating to architecture, building and vehicle design, engineering and product engineering; technological consultancy in the field of motor vehicle and railway car design; technical consultancy relating to the design and development of land, sea and air vehicles; advisory, consultancy and information services relating to all the aforesaid servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 19, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 3, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 3, 2026FIMPFINAL DISPOSITION PROCESSED—
Feb 5, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jan 21, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 21, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Nov 19, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 19, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 19, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 3, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 3, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 28, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 2, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 1, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 1, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 1, 2025ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Feb 22, 2025GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Feb 22, 2025GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 22, 2025CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 21, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 21, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 21, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 21, 2024RFNTREFUSAL PROCESSED BY IB—
Aug 30, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 30, 2024RFRRREFUSAL PROCESSED BY MPU—
Aug 29, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 28, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 23, 2024DOCKASSIGNED TO EXAMINER—
Aug 22, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 22, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 22, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance