USPTO serial 79403004
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Michele S. Katz
Michele S. Katz Advitam IP, LLC150 S. Wacker Drive, Suite 2400Chicago, IL 60606United States| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Protective clothing for the prevention of accident or injury, namely, disposable garment for protection against spontaneous flash in industrial and manufacturing environments; protective work clothing, namely, protective clothing especially made for use in laboratories and oil rigs; protective eyewear; eyewear; * power banks in the nature of * portable power chargers; * power banks in the nature of * battery packs; [ lanyards for mobile phones; ] downloadable computer software for project management | ACTIVE | — |
| 018 | [ Backpacks; bags, namely, rucksacks; handbags, traveling bags; athletic bags ] | SECTION 7(e) - CANCELLED | — |
| 021 | Water bottles, sold empty | ACTIVE | — |
| 025 | [ Clothing, namely, tops and bottoms; footwear; headgear, namely, headwear, hats, caps; snoods being scarves; t-shirts; gloves; coveralls; jackets ] | SECTION 7(e) - CANCELLED | — |
| 037 | Drilling, mining and mining extraction services; consultancy, information and advisory services in the field of [ construction of oil and gas fields, ] drilling, mining, mining extraction, [ and installation, repair and maintenance of equipment for extraction ] of oil and gas; [ project management for construction of oil and gas fields; project management for installation of equipment for generation of renewable energy; supervision and management of construction of oil and gas fields; ] rotating equipment maintenance, construction, overhaul and troubleshooting, all as included within this class | ACTIVE | — |
| 041 | Arranging and conducting of training courses in relation to engineering, oil and mineral extraction; conducting of educational courses relating to engineering, oil and mineral extraction; educational and competency assessment services relating to engineering, oil and mineral extraction, oil and mineral extraction | ACTIVE | — |
| 042 | Provision of data centre facilities; analysis services for oil and gas field exploitation; software development; engineering services; geological prospecting; geological research; geological surveys; oil prospecting; oil and gas field surveys; oil-well testing; technical project studies in the nature of technical project planning and research in the field of oil and gas; consultancy, information and advisory services relating to surveying, prospecting, exploration, testing, analysing, diagnosing, assaying of petroleum, mineral oil, vegetable oil, animal oil, gas, products of petroleum, oils and gas, hydrocarbons, fuels, combustible products, greases, lubricants and/or chemicals | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 12, 2026 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jan 27, 2026 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 27, 2026 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jan 15, 2026 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 29, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 29, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Dec 16, 2025 | NURC | NOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED | — |
| Nov 24, 2025 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| Nov 24, 2025 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Nov 24, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 27, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 27, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| May 27, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 8, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 8, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 2, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Mar 17, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 14, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 14, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 14, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 10, 2025 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Oct 8, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 17, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 16, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 14, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 13, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 10, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 30, 2024 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 30, 2024 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 29, 2024 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |