Drawing for ZHAGA

USPTO serial 79405167

ZHAGA

Reviewed by CopyMark Law Group

Reg. 8122409Status 700Registered
Filing date
Status date
Registration date
Feb 3, 2026
Examiner
MORRIS, KRISTINA KLOIBER
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ZHAGA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Amanda H. Wilcox

Amanda H. Wilcox Taft Stettinius & Hollister LLP200 Public Square, Suite 3500Cleveland, OH 44114United States

Goods and services

ClassDescriptionStatusFirst use
009Control apparatus and software for lighting purposes, namely, electric control devices for lighting fixtures featuring computer hardware and embedded software systems and downloadable computer software for controlling lighting apparatuses; electronic ballasts for lighting purposes, namely, electronic ballasts for lighting, electronic ballasts for lamps, and ballasts for electric lighting apparatus; light emitting diodes (LEDs), and electronic components for lighting, namely, LED modules, and LED modules comprised in whole or in part of integrated light emitting diodes; electronic circuits; sensors for sensing light for lighting control systems and lighting management systemsACTIVE—
011Apparatus for lighting, namely, LED lighting apparatus, electric lamps, lighting fixtures and lighting installations; lighting fixtures and lighting installations, fitted with LED light sources; and structural parts of the aforesaid goodsACTIVE—
042Testing, authentication, and quality control, in particular quality control, testing of the goods and services of others for quality control purposes, testing, analysis and evaluation of the goods and services of others to determine conformity with certification standards and assure compliance with industry standards, technical testing and engineering, technical research and measuring being calibration, technical surveying services, technical project planning and conducting feasibility studies in the field of new technologies with all relating to lighting apparatuses, lighting equipment, lighting control systems, lighting networks, lighting interoperability and lighting management systems; software development, programming and implementation all relating to lighting apparatuses, lighting equipment, lighting control systems, lighting networks, lighting interoperability, and lighting management systems; design of lighting installations and consultancy with regard thereto, and architectural and interior design in the field of lighting; technical planning, namely, lighting design and technology specification services pertaining to permanent or temporary architectural, theatrical, entertainment, commercial and/or residential applications; providing online non-downloadable computer programs for simulation of lighting applications, including via the Internet; providing online non-downloadable computer programs for planning and simulation of lighting applications, including via the InternetACTIVE—
045Legal services; advice concerning aforementioned services; all aforesaid services related to licensing of intellectual property; licensing of industrial property rights and advice related thereto; legal advice and legal information concerning standards and norms for the lighting industryACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 24, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 10, 2026XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Aug 10, 2026XXCRGENERIC MADRID TRANSACTION CREATED—
May 3, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 12, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Feb 25, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 25, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Feb 3, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Feb 3, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 16, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 16, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 10, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 20, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 20, 2025XAECEXAMINER'S AMENDMENT ENTERED—
Nov 20, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Nov 20, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
Nov 20, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
Nov 6, 2025ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Nov 4, 2025PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Oct 18, 2025ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Oct 15, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 15, 2025XAECEXAMINER'S AMENDMENT ENTERED—
Oct 15, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Oct 15, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
Oct 15, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 5, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 5, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 5, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 5, 2025RFNTREFUSAL PROCESSED BY IB—
Mar 17, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 17, 2025RFRRREFUSAL PROCESSED BY MPU—
Feb 14, 2025ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Feb 9, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 8, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 7, 2025ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Feb 3, 2025DOCKASSIGNED TO EXAMINER—
Jan 30, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 1, 2024CHLDCHANGE OF OWNER RECEIVED FROM IB—
Oct 2, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 2, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 26, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance