Drawing for PERISKIN

USPTO serial 79405671

PERISKIN

Reviewed by CopyMark Law Group

Reg. 8063977Status 700Registered
Filing date
Status date
Registration date
Dec 16, 2025
Examiner
KAPLAN, VALERIE ELIZABETH
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with PERISKIN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Andrew D. Skale

Andrew D. Skale Mintz, Levin, Cohn, Ferris, Glovsky and3580 Carmel Mountain RoadSuite 300San Diego, CA 92130

Goods and services

ClassDescriptionStatusFirst use
006Frameworks of metal for building; scaffolding of metal; suspended scaffolding of metal; load-bearing scaffolding of metal; façade scaffolding of metal; mobile scaffolding of metal; mobile work platforms in the nature of scaffolding of metal; beams of common metal for scaffolding; framework of metal for building; metal scaffolding boards; trestle columns of metal being materials of metal for scaffolding; work platforms being scaffolding of metal; work platforms being scaffolding towers of metal; stages for musical performances composed of primarily metal materials; platform steps of metal for use with scaffolding; work platforms of metal for use with scaffolding; staircases of metal for use with scaffolding; beams of metal; locking pins of metal; props of metal, namely, ceiling and wall supports of metal; tubes of metal; supporting frame structures of metal; railings of metal; railing supports of metal; railing holders of metal; metal protection panels to protect workers from falling, weather, and climate issues; floor tiles of metal; nuts, bolts and fastenings, each of metal, for scaffolds and formwork; metal pipe connectors for tubes; metal stanchions; access platforms being scaffolding of metal; adjustable scaffolding base plates of metal; casters of metal; box frames of metal; temporary bridges of metal; viewing platforms of metal in the nature of scaffolding of metal; bleachers of metal; building materials of metal, namely reinforcing materials of metal for building, props of metal, frames of metal, and supports of metal; formwork of metal and metal formwork systems comprised of metal casting forms for concrete, metal reinforcing materials for concrete, and building panels of metal; ceiling panel formwork of metal; column formwork of metal, namely, wall panels of metal and round pillars of metal; parts and fittings for formwork of metal, namely, metal guardrails, building panels of metal, metal expansion joints for floor and wall panels, metal connecting parts, metal anchors, and metal screws; working platforms, namely, prefabricated metal platforms; framework of metal for buildingACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 16, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 28, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jun 28, 2026FIMPFINAL DISPOSITION PROCESSED—
Mar 19, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 16, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 2, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 2, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Dec 16, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Dec 16, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 28, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 28, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 22, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 25, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 25, 2025XAECEXAMINER'S AMENDMENT ENTERED—
Sep 25, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 25, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 25, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 25, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 25, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 25, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 22, 2025RFNTREFUSAL PROCESSED BY IB—
Feb 28, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 28, 2025RFRRREFUSAL PROCESSED BY MPU—
Jan 14, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 13, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 7, 2025DOCKASSIGNED TO EXAMINER—
Oct 16, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 16, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 3, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance