Drawing for BRAIN FOR RAIL

USPTO serial 79406373

BRAIN FOR RAIL

Reviewed by CopyMark Law Group

Reg. 8045189Status 700Registered
Filing date
Status date
Registration date
Dec 2, 2025
Examiner
CANFIELD III, JOSEPH J
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with BRAIN FOR RAIL?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Alisa C. Simmons

Alisa C. Simmons Fitch Even Tabin & Flannery LLP120 South LaSalle Street, Suite 2100Chicago, IL 60603United States

Goods and services

ClassDescriptionStatusFirst use
009Electrical signaling, measuring, counting, recording, monitoring, control, regulating and switching apparatus, namely, electric or electronic sensors for sensing torque, angle, weight, rotation, rotation rate, force, force transduction, position, distance, tilt, incline, pressure, pressure transduction, flow, liquid flow, level indicators, liquid level, path and acceleration; Electrical signaling, measuring, counting, recording, monitoring, control, regulating and switching apparatus, namely, optoelectronic measuring devices, apparatus, and instruments for monitoring, recording, and regulating torque, angle, weight, rotation, force, force transduction, position, distance, tilt, incline, air pressure, pressure transduction, liquid flow, level indicators, liquid level, path and acceleration; Electrical signaling, measuring, counting, recording, monitoring, control, regulating and switching apparatus, namely, lighting-technology-based sensors, namely, rotation rate sensors, pressure sensors, altitude angle sensors, path sensors in the nature of sensors for determining position, force measurement sensors, angle measurement sensors, acceleration sensors, liquid level sensors; Electrical signaling, measuring, counting, recording, monitoring, control, regulating and switching apparatus, namely, apparatus and instruments for measuring tire rotation rates, air pressure, pressure forces, acceleration and measurement angles; electrical data input, processing, transmission, storage and output apparatus, namely, computer hardware and electronic data loggers for use in monitoring railway infrastructure and railway operation; electronic instruments and apparatus for data acquisition and control, namely, computers, computer hardware, and electronic data loggers for use in monitoring railway infrastructure and railway vehicles; electronic instruments and apparatus for data acquisition and control, namely, rotation rate meters; electrical warning light systems; remote signal control devices, namely, railway signals and remote signal controls for operating railway points; downloadable data processing computer programs for use in monitoring railway infrastructure and operation of railway vehicles; data processors, computers, and computer peripherals; signaling, automatic train control, interlocking and control room systems consisting of computers, recorded computer software and communications equipment in the nature of radios for the management and control of mainline and urban rail traffic, signaling control equipment and trackside locating equipment for rail vehicles; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electricity limiters, electrical switches; Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; apparatus for recording, transmission or reproduction of sound or images; Electronic sensors in the nature of pressure sensors, position sensors, force sensors, angle proximity sensors, and acceleration sensors; pressure measuring devices in the nature of pressure gauges; remote control units for electronically moving and operating railway points; computer hardware and downloadable computer software for monitoring railway infrastructure, monitoring railway maintenance, and monitoring operation and maintenance of railway vehicles; computer hardware for the maintenance, monitoring and acquiring data from railroad switches; downloadable software for monitoring of railway points and acquiring data from railway points; downloadable computer software for the analysis and organization of data in the field of deep learning for use in monitoring railway infrastructure and maintenance and in monitoring operation and maintenance of railway vehicles; downloadable interactive software based on artificial intelligence used for reporting required maintenance for railway switches, monitoring railway infrastructure and maintenance and monitoring operation and maintenance of railway vehicles; downloadable artificial intelligence software for the infrastructure sector to monitor for and analyze rail traffic; downloadable optimization software for optimizing machine learning in monitoring railway infrastructure and operation of railway vehicles; downloadable artificial intelligence software for creating data analyses, usage monitoring, inspection planning and timetable optimization in rail traffic; downloadable software for the integration of artificial intelligence and machine learning, for use in maintenance of railway points; touchscreen sensors for the internet of things; gateway routers for the internet of things; downloadable software for deploying and managing virtual machines on a cloud computing platform; all the aforementioned goods for data communication via wired and wireless telecommunication networks for remote data transmission and for data transmission in local networks for use in monitoring railway infrastructure and operation of railway vehicles;ACTIVE—
037Installation, maintenance and repair of electrical and electronic apparatus and equipment in the field of operating and traffic control technology; installation, maintenance and repair of signaling, automatic train control, interlocking and control room systems, consisting of computers, radios, communications equipment and computer hardware for the management and control of mainline and urban traffic, as well as control equipment, signaling equipment and trackside locating equipment for rail vehiclesACTIVE—
038Telecommunication access services; providing access to information via the internet, namely, providing online forums in the field of railroads, rail networks and train connections; electronic data interchange services, namely, provision of communication facilities for the interchange of data by electronic means; computer-aided transmission of information, data and images; computer communication services, namely, communication by computer terminals; providing access to databases in computer networks for monitoring railway infrastructure and operation of railway vehicles; computer communication service for the transmission of information, namely, transmission of information by electronic communications networks; electronic transmission of dataACTIVE—
042Scientific and technological services, namely, scientific research and industrial design services in the field of railroads, rail networks and train connections; industrial scientific data analysis and research services in the field of railroads, rail networks, and train connections; design and development of computer hardware and software in the field of railroads, rail networks, and train connections; services for the digitalization of the rail network in rail transport, namely, computer software design and development in the field of rail transport; engineering design services; technology services related to the development and planning of computer technology solutions and products in the field of sensor and measurement technology; computer hardware and software design services in the field of sensor and measurement technology, namely, the integration of computer systems and the development of platforms and systems for data storage in the field of railroads, rail networks, and train connections; computer software development, programming and implementation in the field of railroads, rail networks, and train connections for others; technology advisory services in the field of product development and quality improvement of software in the field of railroads, rail networks, and train connections; computer technology consulting in the field of artificial intelligence research in the field of railroads, rail networks, and train connections; providing temporary use of online non- downloadable artificial intelligence computer programs on data networks for monitoring rail traffic, for use in monitoring railway infrastructure and operation of railway vehicles, for monitoring of railway points and acquiring data acquisition from railway points, for monitoring and acquiring data from railroad switches, for the analysis and organization of data in the field of deep learning for use in monitoring railway infrastructure and maintenance and in monitoring operation and maintenance of railway vehicles; computer software design in the field of railroads, rail networks, and train connections; design of website home pages; software engineering services in the field of railroads, rail networks, and train connections; Software as a Service [SaaS] featuring software platforms featuring artificial intelligence for managing large amounts of data in the field of railroads, rail networks, and train connections; computer software consulting in the field of artificial intelligence in the infrastructure sector for rail traffic; computer software consulting services in the field of Software as a Service[SaaS] in the field of railroads, rail networks, and train connections; IT consulting services relating to installation, maintenance and repair of computer software in the field of railroads, rail networks, and train connections; remote online backup of computer data, namely, cloud-based data backup services for data backup, for usage monitoring, inspection planning and timetable optimization in rail transport; providing a web hosting platform for all aspects of data processing and data brokerage relating to rail transport.ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 18, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 1, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jun 1, 2026FIMPFINAL DISPOSITION PROCESSED—
Mar 26, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 19, 2026NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 12, 2026NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 9, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 9, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 2, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 2, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Dec 2, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 14, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 14, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 8, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 12, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 4, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 4, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 4, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 7, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 7, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 7, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 15, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 14, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 14, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 7, 2024RFNTREFUSAL PROCESSED BY IB—
Nov 15, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 14, 2024RFRRREFUSAL PROCESSED BY MPU—
Nov 8, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 7, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 29, 2024DOCKASSIGNED TO EXAMINER—
Oct 11, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 11, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 10, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance