Drawing for ALCEMI

USPTO serial 79406508

ALCEMI

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
BULLOFF, TOBY ELLEN
Law office
TMO LAW OFFICE 119

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with ALCEMI?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
004Electrical energy from renewable sources; electrical energy; electrical energy from solar power; electrical energy from wind power; electrical energy from non-renewable sourcesACTIVE—
035Tracking and monitoring of energy consumption; energy price comparison services; procurement of contracts concerning energy supply; billing services in the field of energy; import-export agencies in the field of energy; tracking and monitoring energy consumption for others for account auditing purposes; promoting the benefits of energy efficient lighting technologies to professionals in the lighting field; assistance and consultancy services in the field of business management of companies in the energy sector; information, consultancy and advisory services in relation to all of the aforesaidACTIVE—
037Construction and installation services in relation to energy supply, distribution and storage facilities; installation of energy-saving apparatus; repair of energy supply, distribution and storage installations; construction of geothermal energy installations; construction of wave energy power plants; repair of energy production, distribution and storage plants and machines; maintenance and repair of energy generating, distribution and storage installations; maintenance and repair of wave energy power plants; information, consultancy and advisory services in relation to all of the aforesaidACTIVE—
039Storage, supply and distribution of energy; information, consultancy and advisory services in relation to all of the aforesaidACTIVE—
040Production of energy; generation of energy; leasing of energy generating equipment; generation of electricity from wind energy; production of energy by power plants; generation of electricity from geothermal energy; generation of electricity from solar energy; generation of electricity from wave energy; production of energy by nuclear power plants; information, consultancy and advisory services in relation to all of the aforesaidACTIVE—
042Advisory services relating to energy efficiency; energy auditing; programming of energy management software; advisory services relating to energy efficiency; research in the field of energy; consultancy in the field of energy-saving; engineering services relating to energy supply systems; design and development of energy management software; energy-saving (consultancy in the field of -); development of energy and power management systems; design and development of energy distribution networks; professional consultancy relating to energy efficiency in buildings; technical advice in connection with energy-saving measures; advisory services relating to the use of energy; providing technical advice relating to energy-saving measures; engineering services in the field of energy technology; professional consultancy relating to the conservation of energy; recording data relating to energy consumption in buildings; rental of meters for the recording of energy consumption; technological analysis relating to energy and power needs of others; technological consulting services in the field of alternative energy generation; technological consultancy in the fields of energy production and use; conducting research and technical project studies relating to the use of natural energy; consultancy relating to technological services in the field of power and energy supply; design and development of software for control, regulation and monitoring of solar energy systems; provision of information concerning research and technical project studies relating to the use of natural energyACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 17, 2026FINTFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 28, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 28, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 26, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 9, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 9, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Aug 28, 2025MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Aug 28, 2025ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Mar 1, 2025RFNTREFUSAL PROCESSED BY IB—
Feb 13, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 13, 2025RFRRREFUSAL PROCESSED BY MPU—
Jan 4, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 3, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 26, 2024DOCKASSIGNED TO EXAMINER—
Oct 15, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 15, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 10, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance