Drawing for ALTEA GREEN POWER

USPTO serial 79407242

ALTEA GREEN POWER

Reviewed by CopyMark Law Group

Reg. 7963129Status 700Registered
Filing date
Status date
Registration date
Sep 30, 2025
Examiner
WUDARSKY, MINDY CHEK
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ALTEA GREEN POWER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Erica L. Tritt

Erica L. Tritt The Sladkus Law Group1397 Carroll DriveAtlanta, GA 30318United States

Goods and services

ClassDescriptionStatusFirst use
039Storage of electricity; electricity accumulation being electricity storage; storage of gaseous fuels; electricity distribution via cables; supply of electricity, namely, electricity distribution; distribution of energy for heating and cooling buildings; gas supplying being gas distribution; electricity supply and distribution; providing information relating to the distribution of electricity; gas storage services; storage of electricity in an energy storage plants; leasing the use of power lines to third parties for the transmission of electricity; refuse collection services; consultancy services relating to the distribution of electricity; distribution of gas; information and advisory services in relation to the distribution of energy; storage of energy and fuels; storage of liquefied natural gas on ships; distribution of energy; distribution of electricity, gas and fuels; water distribution and supply; transport services, namely, transportation of renewable energy, fuel, electricity, hydrocarbon; waste transportation services; transport and storage services, namely, transportation and storage of renewable energy, fuel, electricity, hydrocarbon; storage of waste; rental services of power lines to third parties for the transmission of electricity; rental of water distribution systems; rental of electricity, gas, fuel and water pipelines; rental of storage units; transportation of hydrocarbon; distribution services, namely, delivery of fuel, electricity, hydrocarbon, renewable energyACTIVE—
042Scientific research in the field of electricity, namely, research services in relation to construction, repair and installation of industrial systems for the generation and distribution of electricity and industrial systems for extraction, refining and distribution of fuels; hydrocarbon gas, oil, and water exploration services; consultancy in the field of energy measurement to improve energy-saving; professional technological consultancy relating to the conservation of energy; technological consultancy in the fields of energy production and use; creation of control programs for electric operation control and drive modules; technical advice in the field of energy management to improve energy-saving measures; providing information about the design and development of computer software, systems and networks; greenhouse gas emission measuring and analysis; design of electric circuit boards; design of fuel, natural gas, electricity, hydrocarbon, renewable energy storage systems for others; designing of electrical systems for others; design and development of regenerative energy generation systems; design and development of software for control, regulation and monitoring of solar energy systems; engineering drawing services; engineering design services; conducting research and technical project studies relating to the use of natural energy; scientific research services relating to waste analysis; industrial research in the field of renewable energy; analysis and testing services relating to electrical engineering apparatus; advisory services relating to the use of energy; technological consulting services in the field of alternative energy generation; engineering services in the field of gas transport and supply systems; engineering services in the field of electrical power and natural gas production; engineering services for the gas industry; technical design services relating to electricity plants; electrical engineering services; IT consulting services relating to installation, maintenance and repair of computer software; development of energy and power management systems; testing of apparatus in the field of electrical engineering; leasing of computer hardwareACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 30, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 9, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 9, 2026FIMPFINAL DISPOSITION PROCESSED—
Apr 2, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 16, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 16, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Dec 30, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Sep 30, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Sep 30, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 12, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 12, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 6, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 3, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 2, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 2, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 2, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 21, 2025RFNTREFUSAL PROCESSED BY IB—
Jun 20, 2025ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Jun 20, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 20, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 20, 2025CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jun 20, 2025COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
May 28, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 28, 2025RFRRREFUSAL PROCESSED BY MPU—
Mar 29, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 28, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 19, 2025DOCKASSIGNED TO EXAMINER—
Oct 22, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 22, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 17, 2024SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance