Drawing for SOLID FLOW

USPTO serial 79407448

SOLID FLOW

Reviewed by CopyMark Law Group

Reg. 7971549Status 700Registered
Filing date
Status date
Registration date
Oct 7, 2025
Examiner
HESIK, APRIL ANNE
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with SOLID FLOW?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jennifer Fraser

Jennifer Fraser Dykema Gossett PLLC1301 K Street, NW, Suite 1100 WestWashington, DC 20005United States

Goods and services

ClassDescriptionStatusFirst use
001Chemicals and chemical preparations for use in industry and science ; chemical compositions for energy storage; redox-active chemical compounds as battery electrolytesACTIVE—
009Apparatus and devices for storing electric power and supplying electric power, namely, batteries and battery stacks; Battery storage power plant battery cells and battery cells; electric storage batteries; electric accumulators; rechargeable batteries; electrochemical generator batteries; capacitors; electrochemical capacitors; super capacitors; electric power supply apparatus and cabinets, namely, AC/DC power supplies; apparatus and cabinets for uninterruptible electric power supply, namely, AC/DC power supplies; chargers for batteries; chargers for vehicles, boats, ships, airplanes and trains; electric power distribution or control machines and apparatus, namely, electrical power distribution units; stationary power supply machines and apparatus, namely, power supplies; portable condensers; portable power supply; emergency power supply machines and apparatus, namely, power supplies; electric power storage systems comprised of electrical cells and batteries; battery charge devices for electric vehicle charging stations; movable electric power storage systems comprised of batteries; apparatus and devices for transforming electric current, namely, inverters; electric current and voltage regulators, frequency converters, voltage converters, electric current rectifiers and inverters; apparatus and devices for control, management, local or remote monitoring and safety of the aforesaid apparatus and devices, namely, circuit breakers; measuring and thermal control apparatus, namely, thermostats and temperature control apparatus for energy storage plants; fire protection devices, namely, sprinkler systems for fire protection; computer software, namely, downloadable software for the control, management and local or remote monitoring of the aforesaid apparatus and devicesACTIVE—
039Storage of energy and fuels, namely, electrochemical energy storage and storage of fuelsACTIVE—
040Electricity generating; consultancy services relating to the generation of electrical power; generation of electrical power using carbon sequestration; generation of gas and electricity; generation of power; production of electrical power from renewable sources; production of energy by power plants; rental of batteriesACTIVE—
042Scientific research consultancy; scientific and technological consultancy in the field of electrical power storage supply and redox active substances; scientific laboratory services; laboratory services for electrical power storage supply and redox active substances; energy-generation-related or energy-storage-related technological or scientific consultancy; research and development of batteries or other energy-storing devices; chemical research and analysis; testing of redox-active compounds; testing of energy storage devices; computer software consultancy; development of softwareACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 30, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 13, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 13, 2026FIMPFINAL DISPOSITION PROCESSED—
Apr 9, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 23, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 23, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jan 7, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 7, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Oct 7, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 3, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Sep 19, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 19, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 19, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 13, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 9, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 9, 2025XAECEXAMINER'S AMENDMENT ENTERED—
Jul 9, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 9, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 9, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 17, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 17, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 17, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 6, 2025ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Jun 6, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 6, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 6, 2025CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jun 6, 2025COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Mar 15, 2025RFNTREFUSAL PROCESSED BY IB—
Feb 24, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 24, 2025RFRRREFUSAL PROCESSED BY MPU—
Jan 9, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 8, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 31, 2024DOCKASSIGNED TO EXAMINER—
Oct 25, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 25, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 24, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance