Drawing for RED ELÉCTRICA

USPTO serial 79408115

RED ELÉCTRICA

Reviewed by CopyMark Law Group

Reg. 8045220Status 700Registered
Filing date
Status date
Registration date
Dec 2, 2025
Examiner
GUTTADAURO, JULIE MARIE
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with RED ELÉCTRICA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Todd A. Sullivan

Todd A. Sullivan Hayes Soloway P.C.175 Canal StreetManchester, NH 03101United States

Goods and services

ClassDescriptionStatusFirst use
004Electrical energyACTIVE—
007Hydroelectric installations for generating electricity, namely, hydroelectric power stationsACTIVE—
035Data collection, for third parties, of a variety of electric energy services enabling consumers to conveniently compare and purchase those servicesACTIVE—
037Assembly, installation, repair and conservation services for power plants, networks and processing centers; laying electric networks; electric wiring services; renovation, repair and maintenance of electrical wiring; servicing of power supply servicesACTIVE—
039Distribution and transmission of electricity; energy storage; storage of electricity; supply of energy; electricity transport services; rental of power lines to third parties for electricity transmission; distribution of energyACTIVE—
040Electrical energy generation; energy generation servicesACTIVE—
042Scientific and technological services, namely, scientific research, analysis and planning in the field of electricity, as well as research and design services relating thereto; industrial analysis and research services; engineering services, especially, for electrical engineering; engineering services relating to electrical energy production; research regarding electrical safety; environmental assessment services; technical design and planning of power stations; design of electrical systems; development of energy and electricity management systems; scientific and industrial research, specifically, relating to electricity; technological analysis regarding third-party energy and electricity needsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 9, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 22, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jun 22, 2026FIMPFINAL DISPOSITION PROCESSED—
Apr 16, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 30, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 29, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 2, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 2, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Dec 2, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 14, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 14, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 8, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 12, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 10, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 10, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 10, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 12, 2025RFNPREFUSAL PROCESSED BY IB—
Jun 11, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 16, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 16, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 16, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 22, 2025RFNTREFUSAL PROCESSED BY IB—
Feb 5, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 5, 2025RFRRREFUSAL PROCESSED BY MPU—
Dec 31, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 30, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 29, 2024DOCKASSIGNED TO EXAMINER—
Nov 4, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 4, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 31, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance