Drawing for Serial No. 79409681

USPTO serial 79409681

Serial No. 79409681

Reviewed by CopyMark Law Group

Reg. 7846693Status 700Registered
Filing date
Status date
Registration date
Jul 1, 2025
Examiner
CLAYTON, CHERYL A
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with Serial No. 79409681?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jason R. Jones

Jason R. Jones Thorpe North & Western, LLP8180 S. 700 E. Suite 350Sandy, UT 84070United States

Goods and services

ClassDescriptionStatusFirst use
001Adhesives for fixing sealing and carrier mats of plastic, and for tilesACTIVE—
002PrimersACTIVE—
006Profiles made of metal, except precious metal, namely metal edge or end profiles for inflexible and flexible floor and wall coverings; goods for specialist trading in tiles and building materials, namely metal profiles for separating wall and floor coverings, metal stair edge profiles, metal tile frames, metal profiles for bordering balconies or terraces, construction profiles for the formation of settlement joints and expansion joints metal magnetic closures for inspection apertures; metal drains, grates, flanges for use in construction of floor, wall and ceiling waterproofing systems, sold as a kit or separately; metal hardware, namely anchors, screws, washers, all goods of metalACTIVE—
008Trowels; scissors; hand tools, namely rollers for applying adhesives in the nature of an embedded adhesive layer during membrane installationACTIVE—
009Electronic controls for heating installations; electrical power supply units; climate control digital thermostats; level indicators; level gaugesACTIVE—
011Electric floor heating systems, namely, cables, electric mats and sensors for floor heating systems sold as a unit; electrical floor heating cables, panel heating installations, mechanical controls for panel heating installations, floor heating installations, including fittings, namely, textured boards in the nature of {backer boards for underlaying beneath tile or stone}, pipes, all goods of plastic for {heating installations underlaid beneath tile or stone}; shower trays and shower installations and its parts, namely curbs, ramps, benches, and niches, sold as a kit; wash-hand basins being parts of sanitary installations; vanity top sinks; shower partitions in the nature shower screens; bathtubs; shower trays, water pipe connection fittings.ACTIVE—
017Adhesive tape for flooring, walls, ceiling, and other surfaces; semi-processed plastics in the form of strips for fastening fittings behind profiles; polyurethane film for use in sealing and insulating for floors and walls of buildings; waterproofing, uncoupling and drainage membranes and waterproofing strips and boards, sealing and carrying sheets made of synthetic resin for building walls, laying materials consisting of compounds for jointing, namely, pipe jointing compounds.ACTIVE—
019Non-metal building materials for ceramic and stone tile installations, namely transition and edging profiles for floors and walls, stair-nosing profiles, settlement and expansion joint profiles for walls and floors and drainage membranes; non-metal flooring consisting of modular screed mounting plates; setting materials, namely mortars and adhesive mortars for building purposes; underlay for laminate flooring; goods for specialist trading in tiles and building materials, namely profiles for separating wall and floor coverings, stair edge profiles, profiles for bordering balconies or terraces, construction profiles for the formation of settlement joints and expansion joints, all goods of plastic; non-metallic construction materials, namely drain bases, grates, flanges, sold as a kit or separately; non-metal floor drains in the form of shower panels; laying materials consisting of mortars; rigid foam cladding parts for construction purposes, especially for cladding pipes, showers and shower installations, shower trays and shower cabins, bathtubs, whirlpools; construction panels made of rigid foam for use in shower trays, shower partitions, washbasins, washstands, shelves, bathroom cabins, bathtubs, whirlpools, swimming pools, sanitary furniture, sanitary equipment, relaxation loungers, benches, stair landings and shelves; adhesive mortar for fixing sealing and carrier mats of plastic, and for tiles; non-metal floor drains and structural parts therefor.ACTIVE—
041Educational services, conducting workshops and distribution of course material in connection therewith;ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 30, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Apr 13, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 13, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Feb 26, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 6, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 5, 2026FIMPFINAL DISPOSITION PROCESSED—
Oct 1, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 1, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jul 1, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 13, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 13, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 7, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 12, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 8, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 8, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 8, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 8, 2025CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Apr 8, 2025COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Apr 8, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 8, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 8, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 17, 2025RFNTREFUSAL PROCESSED BY IB—
Dec 29, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 29, 2024RFRRREFUSAL PROCESSED BY MPU—
Dec 13, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 12, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 4, 2024DOCKASSIGNED TO EXAMINER—
Dec 3, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 3, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 2, 2024LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Nov 14, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance