USPTO serial 79409877
TUNNEL RENEWAL STRATEGY GRUPPO AUTOSTRADE PER L'ITALIA
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Sep 29, 2026
- Examiner
- BLAKESLEE, RICHARD A
- Law office
- FILE REPOSITORY (FRANCONIA)
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with TUNNEL RENEWAL STRATEGY GRUPPO AUTOSTRADE PER L'ITALIA?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Erica L. Tritt
Erica L. Tritt The Sladkus Law Group1397 Carroll DriveAtlanta, GA 30318United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Construction services relating to the preparation, control, supervision, creation and monitoring of construction projects, in particular in the fields of road and street construction; construction of road tunnels and highways; construction of tunnels; infrastructure construction, namely, building construction for civil infrastructure projects; consultancy services and information services, in relation to construction of road tunnels and highways; building construction supervision, especially in the fields of construction of road tunnels and highways; consultancy relating to residential construction and building construction; restoration of architectural works being building restoration; renovation and repair of roadworks; demolition of buildings | ACTIVE | — |
| 042 | Building design services; civil engineering planning services; construction drafting, in particular design of road tunnels and highways; engineering drawing services; architectural design; industrial design; conducting technical project studies, in the fields of construction of road tunnels and highways; technical project planning, in the fields of construction of road tunnels and highways; construction engineering services in the nature of design and construction projects; designing and conducting feasibility studies in the field of building design; conducting of technical feasibility studies in the field of building design; engineering consultancy services; civil engineering consultancy; consultancy in the field of construction design of road tunnels and highways | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by AUTOSTRADE PER L'ITALIA S.P.A.
- Other trademarks owned by AUTOSTRADE PER L'ITALIA S.P.A.
- Other trademarks owned by AUTOSTRADE PER L'ITALIA S.P.A.
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named TUNNEL RENEWAL STRATEGY GRUPPO AUTOSTRADE PER L'ITALIA
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 29, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Sep 29, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 11, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 11, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 5, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 15, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 15, 2026 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jul 15, 2026 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jul 15, 2026 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jul 15, 2026 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| May 7, 2026 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Apr 20, 2026 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 20, 2026 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Mar 13, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 13, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 13, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 12, 2026 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Mar 12, 2026 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 12, 2026 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 12, 2026 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Mar 12, 2026 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Oct 10, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 20, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 20, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 12, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 11, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 31, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 30, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 30, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 21, 2024 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |