Drawing for TUNNEL RENEWAL STRATEGY GRUPPO AUTOSTRADE PER L'ITALIA

USPTO serial 79409877

TUNNEL RENEWAL STRATEGY GRUPPO AUTOSTRADE PER L'ITALIA

Reviewed by CopyMark Law Group

Reg. 8465415Status 700Registered
Filing date
Status date
Registration date
Sep 29, 2026
Examiner
BLAKESLEE, RICHARD A
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with TUNNEL RENEWAL STRATEGY GRUPPO AUTOSTRADE PER L'ITALIA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Erica L. Tritt

Erica L. Tritt The Sladkus Law Group1397 Carroll DriveAtlanta, GA 30318United States

Goods and services

ClassDescriptionStatusFirst use
037Construction services relating to the preparation, control, supervision, creation and monitoring of construction projects, in particular in the fields of road and street construction; construction of road tunnels and highways; construction of tunnels; infrastructure construction, namely, building construction for civil infrastructure projects; consultancy services and information services, in relation to construction of road tunnels and highways; building construction supervision, especially in the fields of construction of road tunnels and highways; consultancy relating to residential construction and building construction; restoration of architectural works being building restoration; renovation and repair of roadworks; demolition of buildingsACTIVE—
042Building design services; civil engineering planning services; construction drafting, in particular design of road tunnels and highways; engineering drawing services; architectural design; industrial design; conducting technical project studies, in the fields of construction of road tunnels and highways; technical project planning, in the fields of construction of road tunnels and highways; construction engineering services in the nature of design and construction projects; designing and conducting feasibility studies in the field of building design; conducting of technical feasibility studies in the field of building design; engineering consultancy services; civil engineering consultancy; consultancy in the field of construction design of road tunnels and highwaysACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 29, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Sep 29, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 11, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 11, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 5, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 15, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 15, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 15, 2026XAECEXAMINER'S AMENDMENT ENTERED—
Jul 15, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 15, 2026CNEAEXAMINERS AMENDMENT -WRITTEN—
May 7, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Apr 20, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 20, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 13, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 13, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 13, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 12, 2026ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Mar 12, 2026ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 12, 2026REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Mar 12, 2026CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Mar 12, 2026COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Oct 10, 2025RFNTREFUSAL PROCESSED BY IB—
Sep 20, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 20, 2025RFRRREFUSAL PROCESSED BY MPU—
Aug 12, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 11, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 31, 2025DOCKASSIGNED TO EXAMINER—
Jul 30, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 30, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 21, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance