USPTO serial 79410193
SAWBOX
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jul 15, 2025
- Examiner
- MANCA, ALBERTO I
- Law office
- FILE REPOSITORY (FRANCONIA)
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with SAWBOX?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Dwayne K. Goetzel
Dwayne K. Goetzel Kowert, Hood, Munyon, Rankin & Goetzel,1120 S Cap of TX Hwy, Bldg 2, Ste 300Austin, TX 78746United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Woodworking machines, namely, saw machines, and sanding machines; machine tools for wood processing; conveyors being machines and conveyor belts; metalworking machines for steel and plant construction | ACTIVE | — |
| 009 | Downloadable scheduling software for scheduling woodworking processes for automatic wood manufacturing processes; downloadable testing software for creating woodworking operating processes; downloadable programs for computers to generate woodworking processes for automatic wood manufacturing processes; downloadable computer graphics software; downloadable interactive software, namely, downloadable virtual reality software and augmented reality software for creating virtual working processes; downloadable virtual reality software for creating woodworking operating procedures; computer-aided electronic day planners in relation to mechanical and plant engineering; machine control software, namely, recorded software for remotely controlling woodworking machines; material testing instruments and machines, namely, lumber testing machines; electronic components used in machines for controlling, converting and processing electrical signals, namely, resistors, capacitors, inductors, diodes, transistors, integrated circuits, switches, relays, electronic circuit connectors and electric sensors; process monitors, namely, recorded software for monitoring machines for woodworking processes; downloadable industrial process control software; downloadable software for mechanical and plant engineering for monitoring and operating work processes in the woodworking industry | ACTIVE | — |
| 040 | Custom manufacturing of sorting systems for industrial purposes for woodworking processes; custom manufacturing of conveyor belt systems | ACTIVE | — |
| 042 | Product testing, namely, testing of machines and systems; technical advice on the design of machines and systems composed of machines for the production of electronic circuits; analysis and testing services relating to machinery in the nature of electrical engineering apparatus; custom design of software; construction design, namely, construction engineering services related to conveyor systems | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Springer Maschinenfabrik GmbH
- Other trademarks owned by Springer Maschinenfabrik GmbH
- Other trademarks owned by Springer Maschinenfabrik GmbH
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named SAWBOX
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| May 7, 2026 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Apr 20, 2026 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 20, 2026 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Feb 26, 2026 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 11, 2026 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 11, 2026 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 15, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 15, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jul 15, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 27, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 27, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 21, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 25, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 25, 2025 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 25, 2025 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 25, 2025 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 25, 2025 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 17, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 17, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 17, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 8, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 18, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Feb 18, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 7, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 6, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 2, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 25, 2024 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 25, 2024 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 21, 2024 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |