Drawing for MIRALIS

USPTO serial 79410205

MIRALIS

Reviewed by CopyMark Law Group

Reg. 7954162Status 700Registered
Filing date
Status date
Registration date
Sep 23, 2025
Examiner
STADELI, MARTA ANN
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with MIRALIS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Dwayne K. Goetzel

Dwayne K. Goetzel Kowert, Hood, Munyon, Rankin & Goetzel,1120 S Cap of TX Hwy, Bldg 2, Ste 300Austin, TX 78746United States

Goods and services

ClassDescriptionStatusFirst use
001Chemicals used in industry, other than plastics in the form of pastes, dispersions and emulsions for coating and repairing surfaces, and also excluding joint sealants of plastic; fire extinguishing compositions; refrigerating preparations, namely, refrigerant gas for use in industrial cooling systems; mineral substances in the nature of filtering materials for use in mechanical filtration, activated carbon filtration and electrostatic filtration for the HVAC industry; ceramic materials in particulate form, for use as filtering media for use in mechanical filtration, activated carbon filtration and electrostatic filtration for the environmental engineering and filtration industry in air purification, gas filtration and water purification applicationsACTIVE—
007Machines and machine tools for compacting powder materials for construction work; motors and engines, except for land vehicles; garbage disposalsACTIVE—
017Insulators and insulation, packing and insulating materials, namely, foam insulation for use in building and construction; gaskets, namely, gaskets for industrial use; dry density, sealants, except joint sealants, namely, sealant compound for joints made from mineral substances; mineral fibres, namely, mineral wool for building insulation; mineral fibres for insulation, namely, mineral wool for building insulation; mineral wool for the manufacture of filter media; semi-processed foams and films of plastic in the nature of filtering materials for industrial filtration applications for air filtering; foam insulation for use in building and construction; soundproofing materials, namely, foam for use in sound insulation; foam insulation for use in building and construction, namely, foam for use as heat insulationACTIVE—
019Building materials, not of metal, namely, non-metallic minerals for building; asphalt; cement; fireproof cement coatings; cement posts; cement slabs; raw chalk for use as building materials; chimneys, not of metal; claddings, non-metallic, for buildings; concrete; concrete building elements, namely, mineral substances; non-metallic coverings for buildings, namely, non-metal roof coverings and wall claddings; coverings, not of metal, for building, namely, non-metal roof coverings; fireclay; building panels, not of metal; partitions not of metal, being building materials; refractory construction materials, not of metal; reinforcing materials, not of metals, for building; non-metal shingles; shuttering, not of metal, for concrete; wall linings, not of metal, for building; non-metallic minerals for use in constructionACTIVE—
037Installation of insulation solutions in the nature of thermal seals, thermal insulation, thermal insulation walls; building construction; rental of construction machinery; maintenance and repair of construction machineryACTIVE—
042Structural and civil engineeringACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 7, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Apr 23, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 20, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 20, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Apr 3, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 2, 2026FIMPFINAL DISPOSITION PROCESSED—
Dec 23, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Sep 23, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Sep 23, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 5, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 5, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 30, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 26, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 26, 2025ATRVATTORNEY REVIEW COMPLETED—
Jun 23, 2025LIMELIMITATION FROM THE IB - REQUEST EXAM REVIEW—
Jun 17, 2025XAECEXAMINER'S AMENDMENT ENTERED—
Jun 17, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jun 17, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
Jun 17, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
May 17, 2025RFNTREFUSAL PROCESSED BY IB—
May 9, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 9, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 9, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 29, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Apr 29, 2025RFRRREFUSAL PROCESSED BY MPU—
Apr 4, 2025LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Mar 18, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 17, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 13, 2025DOCKASSIGNED TO EXAMINER—
Nov 25, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 25, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 21, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance