Drawing for GRUPO ORTIZ COMPROMISO SOSTENIBLE CONSTRUYENDO SOSTENIBILIDAD

USPTO serial 79410677

GRUPO ORTIZ COMPROMISO SOSTENIBLE CONSTRUYENDO SOSTENIBILIDAD

Reviewed by CopyMark Law Group

Reg. 8299560Status 700Registered
Filing date
Status date
Registration date
Jun 16, 2026
Examiner
MOLK, DANA L
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with GRUPO ORTIZ COMPROMISO SOSTENIBLE CONSTRUYENDO SOSTENIBILIDAD?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Lisa K. Shebar

Lisa K. Shebar Tarolli, Sundheim, Covell & Tummino LLP950 Main Avenue, Suite 710Cleveland, OH 44113United States

Goods and services

ClassDescriptionStatusFirst use
009Downloadable virtual reality training simulation software in the field of construction; downloadable software for planning, integrating and optimizing applications in the field of construction; photovoltaic installations for producing electricity, namely, photovoltaic solar panels for the production of electricity ; downloadable computer software programs for virtual design and construction (VDC) using building information modeling (BIM) in the field of energy management.ACTIVE—
037Construction project management services; custom construction of buildings; prefabricated building construction; construction of sustainable civil engineering structures; building construction supervision and construction management; installation of building automation equipment; sustainable infrastructure construction, namely, building construction for civil infrastructure projects; installation and maintenance services for photovoltaic installations; installation, repair and maintenance services for networks for distribution of gas, electricity and oil; installation, repair and maintenance services for apparatus and devices for controlling energy consumption; services for the construction, installation, repair and maintenance of geothermal energy based power plants and buildings and installations therefor; renovation and restoration of buildings; building construction of railway infrastructure.ACTIVE—
039Distribution of energy; renewable energy distribution; providing online information and advisory services in the field of energy distribution; distribution and storage services for gas, electricity, fuels, carburants, energy from renewable sources, energy obtained from non-renewable sources; transport and storage services for gas, electricity, fuels, carburants, energy from renewable sources, energy obtained from non-renewable sources; services for the distribution, supply and transmission of energyACTIVE—
042Architectural services; civil infrastructure design services; civil structural engineering services; design and development of virtual reality software; development of computer programs for simulating sustainable virtual buildings; custom design of prototypes; computer project management services in the field of software systems used for architectural projects; architectural services for building design; engineering testing, namely, testing of apparatus in the field of electrical engineering; industrial testing of engineering structures; environmental testing services; environmental testing and inspection services, namely, monitoring of environmental conditions and activities affecting the structural environment within civil engineering structures; environmental testing and inspection services, namely, monitoring events and human and natural activities that affect environmental conditions within civil engineering structures; technical project planning in the engineering sector; engineering design and computer-aided engineering services for others; analysis of structural behavior of building materials; development of computer programs recorded on data media in the nature of CAD/CAM computer software designed for use in the field of automated construction and manufacturing; computer-aided design services related to building projects; design and development of energy distribution networks; design and development of renewable energy generation systemsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 16, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 16, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jun 16, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 14, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Apr 28, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 28, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 27, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 27, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Apr 22, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 2, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 2, 2026XAECEXAMINER'S AMENDMENT ENTERED—
Apr 2, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 2, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 2, 2026CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 4, 2026DOCKASSIGNED TO EXAMINER—
Dec 14, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 14, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 14, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 5, 2025RFNTREFUSAL PROCESSED BY IB—
Jun 13, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 13, 2025RFRRREFUSAL PROCESSED BY MPU—
Apr 10, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 9, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 18, 2025DOCKASSIGNED TO EXAMINER—
Nov 29, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 29, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 28, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance