Drawing for ENGO

USPTO serial 79411902

ENGO

Reviewed by CopyMark Law Group

Reg. 8329976Status 700Registered
Filing date
Status date
Registration date
Jul 7, 2026
Examiner
MANCA, ALBERTO I
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ENGO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

CAROLE E. KLINGER

Carole E. Klinger Fross Zelnick Lehrman & Zissu, P.C.151 W 42nd St., 17 Fl.New York, NY 10036United States

Goods and services

ClassDescriptionStatusFirst use
007Ignition devices being gas-operated blow torches; ejectors in the nature of vacuum pumps used for vacuum generation and mixing of media; control valves as machine components for controlling the flow of gases and liquids, namely, for high-temperature applicationsACTIVE—
009Laboratory apparatus and instruments, namely, automated gas sampling valves and automated selector valves for controlling gas streams, in particular for emission measurement and analysis instruments; material testing instruments and machines, namely, droplet erosion apparatus, abrasion apparatus, and wear testing apparatus; scientific measuring and testing machines and instruments, namely, combustion test rigs, flow test benches, and hydrostatic pressure testing apparatus; measuring devices, namely, total pressure rakes, temperature rakes, and emissions rakes; scientific instruments, namely, instrumentation feedthroughs for transmitting electrical signals and fluids through pressure-tight or vacuum-tight barriers, including the combined passage of sensors, cables, electrodes and fluid conduits; scientific apparatus and instruments, namely, ignition systems comprised primarily of electric igniter wires, electrodes, fuel injector testers, electrical transducers, and thermocouples and also including gas operated flame blow torches, combustion chambers, and spark plugs, for scientific and industrial combustion research; scientific, optical, measuring, and checking apparatus and instruments, namely, infrared and visual cameras for monitoring high temperature and high-pressure processes in research and industrial applications; all the aforementioned goods are used only in the industrial or research field, not in combination with mobile telephones, tablet computers, smartwatches and other communication apparatus, and not in combination with earphones or audio apparatusACTIVE—
011Gas burners; combustion chambers; steam generators; hot air blowers; oxyhydrogen burners; cooling installations and machines, namely, cryogenic systems comprised of cryogenic vaporizers, cryogenic freezers and refrigerators, and cryogenic coolers; regulating accessories for water installations and gas installations and pipes, namely, pressure regulators; melting furnaces; incinerators; heat accumulators; heat exchangers other than parts of machines; water heaters for industrial use; water cooling installationsACTIVE—
040Metal treatment, namely, treatment of metal surfaces by means of precision grinding techniques; production of electrical energy from renewable sources; treatment of materials by laser beamsACTIVE—
042Engineering drawing services, namely, preparation of fabrication drawings for test rigs, test equipment and test articles; computer assisted industrial analysis and research services, namely, finite element method (FEM) and computational fluid dynamics (CFD) simulations and analyses using self-developed numerical models; custom design of prototypes, namely, customer-specific test rigs, test equipment and measurement technology; scientific and technological services, namely, conducting scientific feasibility studies and development of new testing and measurement technologies and methods in the field of combustion, thermodynamics, fluid mechanics and material research; scientific research, namely, conducting scientific experiments in the fields of combustion, thermal, flow, erosion, abrasion, wear and explosion testing, and subsequent scientific analysis of data related thereto; scientific and technology research services, namely, design and development of measuring and testing methods for combustion, thermal, flow, erosion, abrasion, wear and explosion testing; design and development of systems for regenerative energy production; product research and development, namely, development of test rigs, test equipment and measurement technology; engineering services in the field of energy technology; technical measuring and testing services, namely, combustion and thermal testing, flow testing and measurements including airflow checks, erosion testing, abrasion testing, wear testing, explosion testing, and experimental materials testing, all for scientific research and development purposes; technical measuring and testing services, namely, combustion and thermal testing, flow testing and measurements including airflow checks, erosion testing, abrasion testing, wear testing, explosion testing and experimental materials testing, for quality assurance purposes in the field of material testing; scientific measurement data analysis in the field of combustion and thermal testing, flow testing and measurements including airflow checks, erosion testing, abrasion testing, wear testing, explosion testing, and experimental materials testing; engineering services, namely, integration of instrumentation systems; all the aforementioned services are used only in the industrial or research field, not in combination with mobile telephones, tablet computers, smartwatches and other communication apparatus, and not in combination with earphones or audio apparatusACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 7, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 7, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jul 7, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 28, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
May 19, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 19, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 13, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 11, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 11, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Apr 23, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 23, 2026XAECEXAMINER'S AMENDMENT ENTERED—
Apr 23, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 23, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 23, 2026CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 14, 2026ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Apr 10, 2026EXPTEXPARTE APPEAL TERMINATED—
Apr 10, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 10, 2026XAECEXAMINER'S AMENDMENT ENTERED—
Apr 10, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 10, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 10, 2026CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 25, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 25, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 25, 2026ALIEASSIGNED TO LIE—
Mar 18, 2026ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Mar 18, 2026EXPIEX PARTE APPEAL-INSTITUTED—
Mar 18, 2026JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Mar 18, 2026EXAFEXPARTE APPEAL RECEIVED AT TTAB—
Sep 19, 2025GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Sep 19, 2025GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 19, 2025CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 11, 2025LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Aug 26, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 26, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 26, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 15, 2025RFNTREFUSAL PROCESSED BY IB—
Feb 26, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 26, 2025RFRRREFUSAL PROCESSED BY MPU—
Jan 11, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 10, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 2, 2025DOCKASSIGNED TO EXAMINER—
Dec 30, 2024MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 30, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 23, 2024LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Dec 12, 2024REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance